Merge pull request #36 from Energinet-AIG/legal
Browse files Browse the repository at this point in the history
New legal agreement
  • Loading branch information
matbkri authored Jan 27, 2023
2 parents 0ec349e + d51131e commit 778bc1d
Show file tree
Hide file tree
Showing 6 changed files with 10 additions and 46 deletions.
10 changes: 10 additions & 0 deletions AGREEMENT.txt
Original file line number Diff line number Diff line change
@@ -0,0 +1,10 @@
Information concerning the use of Power Plant and Model Test Bench.

Energinet provides the Power Plant and Model Test Bench (PP-MTB) for the purpose of developing a prequalification test bench for production facility and simulation performance which the facility owner may use in its own simulation environment in order to pre-test compliance with the applicable technical requirements for simulation models.

The PP-MTB is provided under the following considerations:
• Use of the PP-MTB and its results are indicative and for informational purposes only. Energinet may only in its own simulation environment perform conclusive testing, performance and compliance of the simulation models developed and supplied by the facility owner.
• The facility owner should always use the latest version of the PP-MTB from Energinet in order to get the most correct results.
• Energinet encourages the facility owner to report issues in PP-MTB and propose amendments to Energinet.
• Use of the PP-MTB are at the facility owners and the users own risk. Energinet is not responsible for any damage to hardware or software, including simulation models or computers.
• All intellectual property rights, including copyright to the PP-MTB remains at Energinet in accordance with applicable Danish law. Energinet does however grant a worldwide, non-exclusive, non-payable right to use, modify and distribute the PP-MTB as a whole or partly. Energinet may withdraw or modify the right to use, modify and distribute.
10 changes: 0 additions & 10 deletions Plotter/plotter.py
Original file line number Diff line number Diff line change
@@ -1,13 +1,3 @@
"""
Information concerning the use of Power Plant and Model Test Bench
Energinet provides the Power Plant and Model Test Bench (PP-MTB) for the purpose of developing a prequalification test bench for production facility and simulation performance which the facility owner may use in its own simulation environment in order to pre-test compliance with the applicable technical requirements for simulation models. The PP-MTB are provided under the following considerations:
- Use of the PP-MTB and its results are indicative and for informational purposes only. Energinet may only in its own simulation environment perform conclusive testing, performance and compliance of the simulation models developed and supplied by the facility owner.
- Downloading the PP-MTB and updating the PP-MTB must only be done through a Energinet provided link. Users of the PP-MTB must not share the PP-MTB with other facility owners. The facility owner should always use the latest version of the PP-MTB in order to get the most correct results.
- Use of the PP-MTB are at the facility owners and the users own risk. Energinet is not responsible for any damage to hardware or software, including simulation models or computers.
- All intellectual property rights, including copyright to the PP-MTB remains at Energinet in accordance with applicable Danish law.
"""

from os import listdir, makedirs
from os.path import join, split, splitext, exists
import re
Expand Down
9 changes: 0 additions & 9 deletions Powerfactory/execute.py
Original file line number Diff line number Diff line change
@@ -1,12 +1,3 @@
"""
Information concerning the use of Power Plant and Model Test Bench
Energinet provides the Power Plant and Model Test Bench (PP-MTB) for the purpose of developing a prequalification test bench for production facility and simulation performance which the facility owner may use in its own simulation environment in order to pre-test compliance with the applicable technical requirements for simulation models. The PP-MTB are provided under the following considerations:
- Use of the PP-MTB and its results are indicative and for informational purposes only. Energinet may only in its own simulation environment perform conclusive testing, performance and compliance of the simulation models developed and supplied by the facility owner.
- Downloading the PP-MTB and updating the PP-MTB must only be done through a Energinet provided link. Users of the PP-MTB must not share the PP-MTB with other facility owners. The facility owner should always use the latest version of the PP-MTB in order to get the most correct results.
- Use of the PP-MTB are at the facility owners and the users own risk. Energinet is not responsible for any damage to hardware or software, including simulation models or computers.
- All intellectual property rights, including copyright to the PP-MTB remains at Energinet in accordance with applicable Danish law.
"""
import pandas as pd
import math
import sys
Expand Down
9 changes: 0 additions & 9 deletions Powerfactory/exportResults.py
Original file line number Diff line number Diff line change
@@ -1,12 +1,3 @@
"""
Information concerning the use of Power Plant and Model Test Bench
Energinet provides the Power Plant and Model Test Bench (PP-MTB) for the purpose of developing a prequalification test bench for production facility and simulation performance which the facility owner may use in its own simulation environment in order to pre-test compliance with the applicable technical requirements for simulation models. The PP-MTB are provided under the following considerations:
- Use of the PP-MTB and its results are indicative and for informational purposes only. Energinet may only in its own simulation environment perform conclusive testing, performance and compliance of the simulation models developed and supplied by the facility owner.
- Downloading the PP-MTB and updating the PP-MTB must only be done through a Energinet provided link. Users of the PP-MTB must not share the PP-MTB with other facility owners. The facility owner should always use the latest version of the PP-MTB in order to get the most correct results.
- Use of the PP-MTB are at the facility owners and the users own risk. Energinet is not responsible for any damage to hardware or software, including simulation models or computers.
- All intellectual property rights, including copyright to the PP-MTB remains at Energinet in accordance with applicable Danish law.
"""
from os import remove
import pandas as pd
from types import SimpleNamespace
Expand Down
9 changes: 0 additions & 9 deletions Powerfactory/setupCase.py
Original file line number Diff line number Diff line change
@@ -1,12 +1,3 @@
"""
Information concerning the use of Power Plant and Model Test Bench
Energinet provides the Power Plant and Model Test Bench (PP-MTB) for the purpose of developing a prequalification test bench for production facility and simulation performance which the facility owner may use in its own simulation environment in order to pre-test compliance with the applicable technical requirements for simulation models. The PP-MTB are provided under the following considerations:
- Use of the PP-MTB and its results are indicative and for informational purposes only. Energinet may only in its own simulation environment perform conclusive testing, performance and compliance of the simulation models developed and supplied by the facility owner.
- Downloading the PP-MTB and updating the PP-MTB must only be done through a Energinet provided link. Users of the PP-MTB must not share the PP-MTB with other facility owners. The facility owner should always use the latest version of the PP-MTB in order to get the most correct results.
- Use of the PP-MTB are at the facility owners and the users own risk. Energinet is not responsible for any damage to hardware or software, including simulation models or computers.
- All intellectual property rights, including copyright to the PP-MTB remains at Energinet in accordance with applicable Danish law.
"""
import math
import powerfactory as PF # type: ignore
from types import SimpleNamespace
Expand Down
9 changes: 0 additions & 9 deletions Powerfactory/setupPlots.py
Original file line number Diff line number Diff line change
@@ -1,12 +1,3 @@
"""
Information concerning the use of Power Plant and Model Test Bench
Energinet provides the Power Plant and Model Test Bench (PP-MTB) for the purpose of developing a prequalification test bench for production facility and simulation performance which the facility owner may use in its own simulation environment in order to pre-test compliance with the applicable technical requirements for simulation models. The PP-MTB are provided under the following considerations:
- Use of the PP-MTB and its results are indicative and for informational purposes only. Energinet may only in its own simulation environment perform conclusive testing, performance and compliance of the simulation models developed and supplied by the facility owner.
- Downloading the PP-MTB and updating the PP-MTB must only be done through a Energinet provided link. Users of the PP-MTB must not share the PP-MTB with other facility owners. The facility owner should always use the latest version of the PP-MTB in order to get the most correct results.
- Use of the PP-MTB are at the facility owners and the users own risk. Energinet is not responsible for any damage to hardware or software, including simulation models or computers.
- All intellectual property rights, including copyright to the PP-MTB remains at Energinet in accordance with applicable Danish law.
"""
from types import SimpleNamespace

def setupPlots(app,eventPlot,faultPlot,phasePlot,uLim,ctrlMode,Qmode,symSim,inputBlock,inputSignal,inputScaling):
Expand Down