Skip to content

build: Remove remaining circular link dependencies #6840

build: Remove remaining circular link dependencies

build: Remove remaining circular link dependencies #6840

Triggered via pull request August 16, 2024 16:34
Status Failure
Total duration 3m 53s
Billable time 3m
Artifacts

ci_tests.yml

on: pull_request
semantic_pull_request
4s
semantic_pull_request
is_not_draft_pull_request
2s
is_not_draft_pull_request
Matrix: cpu_builds
Matrix: check_code_style_and_documentation
Matrix: cuda_builds
if_not_unassigned_pull_request
3s
if_not_unassigned_pull_request
are_submodules_in_sync
8s
are_submodules_in_sync
baseline_log
5s
baseline_log
code_coverage  /  build_test_deploy
2m 5s
code_coverage / build_test_deploy
run_integrated_tests  /  build_test_deploy
run_integrated_tests / build_test_deploy
check_that_all_jobs_succeeded
0s
check_that_all_jobs_succeeded
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Check code style / build_test_deploy
Process completed with exit code 8.
Ubuntu (20.04, gcc 9.4.0, open-mpi 4.0.3) / build_test_deploy
Process completed with exit code 1.
Ubuntu (22.04, clang 15.0.7, open-mpi 4.1.2) / build_test_deploy
Process completed with exit code 1.
Ubuntu (20.04, gcc 10.5.0, open-mpi 4.0.3) - github codespaces / build_test_deploy
Process completed with exit code 1.
Ubuntu (22.04, gcc 12.3.0, open-mpi 4.1.2) / build_test_deploy
Process completed with exit code 1.
Ubuntu (22.04, gcc 11.4.0, open-mpi 4.1.2) / build_test_deploy
Process completed with exit code 1.
code_coverage / build_test_deploy
Process completed with exit code 1.
check_that_all_jobs_succeeded
Process completed with exit code 1.