Skip to content

chore(deps): update all non-major dependencies #635

chore(deps): update all non-major dependencies

chore(deps): update all non-major dependencies #635

Triggered via pull request December 4, 2024 20:48
Status Failure
Total duration 27s
Artifacts

integrate.yaml

on: pull_request
Matrix: Code Coverage
Matrix: Coding Standards
Matrix: Dependency Analysis
Matrix: Mutation Tests
Matrix: Static Code Analysis
Matrix: Tests
Fit to window
Zoom out
Zoom in

Annotations

15 errors and 1 warning
Tests (8.0, locked)
Process completed with exit code 4.
Dependency Analysis (8.2, locked)
Process completed with exit code 4.
Tests (8.1, lowest)
The job was canceled because "_8_0_locked" failed.
Tests (8.2, locked)
The job was canceled because "_8_0_locked" failed.
Static Code Analysis (8.2, locked)
Process completed with exit code 4.
Tests (8.1, locked)
The job was canceled because "_8_0_locked" failed.
Tests (8.1, locked)
The operation was canceled.
Tests (8.0, highest)
The job was canceled because "_8_0_locked" failed.
Tests (8.2, lowest)
The job was canceled because "_8_0_locked" failed.
Tests (8.0, lowest)
The job was canceled because "_8_0_locked" failed.
Tests (8.2, highest)
The job was canceled because "_8_0_locked" failed.
Tests (8.1, highest)
The job was canceled because "_8_0_locked" failed.
Mutation Tests (8.2, locked)
Process completed with exit code 4.
Code Coverage (8.2, locked)
Process completed with exit code 4.
Coding Standards (8.2, locked)
Process completed with exit code 2.
Coding Standards (8.2, locked)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636