You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The entire area isn't connected to the station's pipe and power network at round start. This will lead to the inevitable power outage. This also makes refilling air using the distro pipenet, and any attempts to purge contaminants from the air, impossible
It's also missing a griddle. I forgot to tack that onto the title, but here we are.
The text was updated successfully, but these errors were encountered:
Reporting client info: Client Information:
BYOND:514.1589
Key:sentientvoid
Round ID:
3150
Testmerges:
Reproduction:
The entire area isn't connected to the station's pipe and power network at round start. This will lead to the inevitable power outage. This also makes refilling air using the distro pipenet, and any attempts to purge contaminants from the air, impossible
It's also missing a griddle. I forgot to tack that onto the title, but here we are.
The text was updated successfully, but these errors were encountered: