Skip to content

Latest commit

 

History

History
26 lines (24 loc) · 2.11 KB

wp2-planning.md

File metadata and controls

26 lines (24 loc) · 2.11 KB

WP2 Planning

Planned steps

Action Progress Next steps Comments
Planning in detail (end feb/start of mars) VC 60% Set date for VC SCB,ISTAT,INSEE,SSB
Setup google-drive documents and share plus share prezi 80% SCB
Setup the general structure of the documents 60% SCB
During hackathon in Rome try to capture materials for scenarios in cookbook 100% SCB
Translate the scenarios to the cookbook 90% SCB
Build first draft of cookbook based on materials from hackaton 100% SCB
Deliver draft of cookbook in May 100% SCB
Work on architectural recomendations 15% SCB
Work on interactive guidence 0% SCB
Test the current output during modernstats world workshop 0% SCB
Deliver draft of arch guidance in July 100% SCB
VC with WP2 members in August 0% SCB,ISTAT,INSEE,SSB
Between july and december - add guidance and scenarios based on experience and the work done in WP1 and WP3 0% SCB
Align deliverables and deliver draft versions in dec 2019 0% SCB
Setup indicators for test of usability in January 2020 0% SCB
Test the deliverables using developers and architects that are not part of the work and get feedback in January 2020 0% SCB,ISTAT,INSEE,SSB
Align WP2 deliverables with all other WPs in M14 0% SCB,ISTAT,INSEE,SSB
Continued work on adding guidance, cookbook scenarios and interactive guidance M13-M18 0% SCB
Align deliverables and deliver Drafts M13-M18 0% SCB
Perform second test on deliverables M18 0% SCB