update example output after sanitisation
Browse files Browse the repository at this point in the history
  • Loading branch information
prakaa committed Oct 17, 2024
1 parent d8af922 commit 2b8f145
Show file tree
Hide file tree
Showing 62 changed files with 300 additions and 396 deletions.
4 changes: 2 additions & 2 deletions example_output/6.0/batteries_summary.csv
Original file line number Diff line number Diff line change
Expand Up @@ -5,7 +5,7 @@ Ballarat Energy Storage System,Battery Storage,VIC,VIC,Western Victoria,Existing
Blyth BESS,Battery Storage,SA,CSA,Mid-North SA,Anticipated,,Battery,Battery,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,,,All Battery storage (2hrs storage),All Battery storage (2hrs storage),,Blyth BESS,Battery Storage
Bolivar Waste Water Treatment BESS,Battery Storage,SA,CSA,,Existing,,Battery,Battery,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,,,All Battery storage (2hrs storage),All Battery storage (2hrs storage),,Bolivar Waste Water Treatment BESS,Battery Storage
Bouldercombe Battery project,Battery Storage,QLD,CQ,Fitzroy,Anticipated,,Battery,Battery,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,,,All Battery storage (2hrs storage),All Battery storage (2hrs storage),,Bouldercombe Battery project,Battery Storage
Broken Hill BESS,Battery Storage,NSW,SNSW,Broken Hill,Committed*,,Battery,Battery,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,,,All Battery storage (1hr storage),All Battery storage (1hr storage),,Broken Hill BESS,Battery Storage
Broken Hill BESS,Battery Storage,NSW,SNSW,Broken Hill,Committed,,Battery,Battery,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,,,All Battery storage (1hr storage),All Battery storage (1hr storage),,Broken Hill BESS,Battery Storage
Bulgana Green Power Hub BESS,Battery Storage,VIC,VIC,Western Victoria,Existing,,Battery,Battery,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,,,All Battery storage (2hrs storage),All Battery storage (2hrs storage),,Bulgana Green Power Hub BESS,Battery Storage
Bungama Solar BESS,Battery Storage,SA,CSA,Mid-North SA,Anticipated,,Battery,Battery,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,,,All Battery storage (2hrs storage),All Battery storage (2hrs storage),,Bungama Solar BESS,Battery Storage
Capital Battery,Battery Storage,NSW,SNSW,Tumut,Committed,,Battery,Battery,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,,,All Battery storage (2hrs storage),All Battery storage (2hrs storage),,Capital Battery,Battery Storage
Expand Down Expand Up @@ -50,6 +50,6 @@ Ulinda Park BESS,Battery Storage,QLD,SQ,Darling Downs,Anticipated,,Battery,Batte
Victorian Big Battery,Battery Storage,VIC,VIC,,Existing,,Battery,Battery,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,,,All Battery storage (2hrs storage),All Battery storage (2hrs storage),,Victorian Big Battery,Battery Storage
Wallgrove Grid Battery project,Battery Storage,NSW,SNW,,Existing,,Battery,Battery,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,,,All Battery storage (2hrs storage),All Battery storage (2hrs storage),,Wallgrove Grid Battery project,Battery Storage
Wandoan South BESS,Battery Storage,QLD,SQ,Darling Downs,Existing,,Battery,Battery,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,,,All Battery storage (2hrs storage),All Battery storage (2hrs storage),,Wandoan South BESS,Battery Storage
Waratah Super Battery,Battery Storage,NSW,SNW,,Committed*,,Battery,Battery,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,,,All Battery storage (2hrs storage),All Battery storage (2hrs storage),,Waratah Super Battery,Battery Storage
Waratah Super Battery,Battery Storage,NSW,SNW,,Committed,,Battery,Battery,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,,,All Battery storage (2hrs storage),All Battery storage (2hrs storage),,Waratah Super Battery,Battery Storage
Western Downs Battery,Battery Storage,QLD,SQ,Darling Downs,Anticipated,,Battery,Battery,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,,,All Battery storage (1hr storage),All Battery storage (1hr storage),,Western Downs Battery,Battery Storage
Wooreen Energy Storage System,Battery Storage,VIC,VIC,Gippsland,Anticipated,,Battery,Battery,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,Battery Storage,,,All Battery storage (4hrs storage),All Battery storage (4hrs storage),,Wooreen Energy Storage System,Battery Storage
6 changes: 3 additions & 3 deletions example_output/6.0/battery_properties.csv
Original file line number Diff line number Diff line change
@@ -1,7 +1,7 @@
Property,Battery storage (1hr storage),Battery storage (2hrs storage),Battery storage (4hrs storage),Battery storage (8hrs storage),Virtual Power Plants (aggregated ESS),Units
Maximum power1,1,1,1,1,1,MW
Energy capacity2,1,2,4,8,2.2,MWh
Round trip efficiency (aggregated)3,not applicable,not applicable,not applicable,not applicable,85,%
Maximum power,1,1,1,1,1,MW
Energy capacity,1,2,4,8,2.2,MWh
Round trip efficiency (aggregated),not applicable,not applicable,not applicable,not applicable,85,%
Charge efficiency (utility),91.6515138991168,91.6515138991168,92.19544457292888,91.10433579144299,not applicable,%
Discharge efficiency (utility),91.6515138991168,91.6515138991168,92.19544457292888,91.10433579144299,not applicable,%
Round trip efficiency (utility),84,84,85,83,not applicable,%
Expand Down
2 changes: 1 addition & 1 deletion example_output/6.0/build_costs_pumped_hydro.csv
Original file line number Diff line number Diff line change
Expand Up @@ -2,4 +2,4 @@ Technology,Source,2022-23,2023-24,2024-25,2025-26,2026-27,2027-28,2028-29,2029-3
Pumped Hydro (8hrs storage),GenCost 2022-23 Final report,3355.4633999999996,3290.2360999999996,3227.1474,3164.0586999999996,3100.97,3035.7427,2970.5153999999998,2904.2187999999996,2838.9914999999996,2835.7835999999998,2831.5063999999998,2828.2985,2825.0906,2821.8826999999997,2818.6748,2815.4669,2812.2589999999996,2809.0510999999997,2805.8432,2801.566,2797.2888,2793.0116,2788.7344,2784.4572,2780.18,2775.9028,2771.6256,2768.4177,2764.1405,2758.794,2754.5168,2749.1702999999998
Pumped Hydro (24hrs storage),GenCost 2022-23 Final report,4709.1972,4618.3067,4528.4855,4439.7336,4352.0509999999995,4260.0912,4168.131399999999,4076.1715999999997,3984.2117999999996,3978.8652999999995,3974.5880999999995,3969.2416,3964.9644,3960.6872,3955.3406999999997,3951.0634999999997,3946.7862999999998,3942.5090999999998,3938.2318999999998,3931.8160999999996,3926.4696,3920.0537999999997,3913.638,3908.2915,3901.8756999999996,3896.5291999999995,3890.1133999999997,3884.7668999999996,3878.3511,3871.9352999999996,3865.5195,3859.1036999999997
Pumped Hydro (48hrs storage),GenCost 2022-23 Final report,7074.488799999999,6937.618399999999,6801.8173,6670.2934,6537.700199999999,6399.760499999999,6261.8207999999995,6122.8117999999995,5984.8721,5977.387,5969.9019,5963.486099999999,5956.000999999999,5949.5851999999995,5942.1001,5935.6843,5929.268499999999,5922.8526999999995,5915.3676,5906.8132,5898.2588,5888.6350999999995,5880.0806999999995,5870.456999999999,5861.902599999999,5853.348199999999,5843.724499999999,5835.170099999999,5826.615699999999,5816.991999999999,5806.299,5796.6753
BOTN - Cethana1,Hydro Tasmania,2400.7510652934843,2358.571115821031,2316.789046434522,2274.7353639180214,2233.7663388176998,2190.4524397830432,2146.984307280013,2102.736045872136,2058.9688815676777,2059.8853684937185,2061.3597174957654,2061.666709105906,2063.149123420511,2064.636879768683,2064.950369023556,2066.446312414044,2067.9476742532747,2068.8288931983034,2070.3395858870003,2070.729464031313,2071.055448441452,2071.4479396253123,2071.8418671904487,2072.171243094408,2072.5678245836666,2072.8994232647974,2073.2986855883837,2073.6325296233017,2074.034500056472,2074.437060990448,2074.8402132926844,2075.24395783191
BOTN - Cethana,Hydro Tasmania,2400.7510652934843,2358.571115821031,2316.789046434522,2274.7353639180214,2233.7663388176998,2190.4524397830432,2146.984307280013,2102.736045872136,2058.9688815676777,2059.8853684937185,2061.3597174957654,2061.666709105906,2063.149123420511,2064.636879768683,2064.950369023556,2066.446312414044,2067.9476742532747,2068.8288931983034,2070.3395858870003,2070.729464031313,2071.055448441452,2071.4479396253123,2071.8418671904487,2072.171243094408,2072.5678245836666,2072.8994232647974,2073.2986855883837,2073.6325296233017,2074.034500056472,2074.437060990448,2074.8402132926844,2075.24395783191
Original file line number Diff line number Diff line change
@@ -1,2 +1,2 @@
Financial year,2024-25,2025-26,2026-27,2027-28,2028-29,2029-30
Renewable capacity target (MW),0,0,4000,8400,13240,18400
Renewable capacity target (MW),0,0,4000,8400,13240,18400
6 changes: 3 additions & 3 deletions example_output/6.0/committed_generators_summary.csv
Original file line number Diff line number Diff line change
@@ -1,11 +1,11 @@
Committed generator,Technology type,Region,Sub-region,REZ location,Status,Regional build cost zone,Fuel type,Fuel cost mapping,Summer rating (MW),Winter rating (MW),Forced outage rate_Full outage (% of time)_Until 2022,Forced outage rate_Full outage (% of time)_Post 2022,Forced outage rate_Partial outage (% of time)_Until 2022,Forced outage rate_Partial outage (% of time)_Post 2022,Mean time to repair_Full outage_Until 2022,Mean time to repair_Full outage_Post 2022,Mean time to repair_Partial outage_Until 2022,Mean time to repair_Partial outage_Post 2022,Maintenance duration (%),Minimum load (MW),Maximum capacity factor (%),FOM ($/kW/annum),VOM ($/MWh sent-out),Heat rate,MLF,Auxiliary load (%)
Kurri Kurri OCGT,OCGT,NSW,SNW,,Committed,,Gas,Kurri Kurri,Kurri Kurri OCGT,Kurri Kurri OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,,,Kurri Kurri OCGT,Kurri Kurri OCGT,Kurri Kurri OCGT2,Kurri Kurri OCGT,OCGT
Tallawarra B*,OCGT,NSW,SNW,,Committed,,Gas,Tallawarra B,Tallawarra B*,Tallawarra B*,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,,,Tallawarra B,Tallawarra B,Tallawarra B,Tallawarra B*,OCGT
Kidston ,Pumped Hydro,QLD,NQ,,Committed,,Water,Hydro,Kidston ,Kidston ,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,,,All Hydro,All Hydro,,Kidston ,Hydro
Tallawarra B,OCGT,NSW,SNW,,Committed,,Gas,Tallawarra B,Tallawarra B,Tallawarra B,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,OCGT,,,Tallawarra B,Tallawarra B,Tallawarra B,Tallawarra B,OCGT
Kidston,Pumped Hydro,QLD,NQ,,Committed,,Water,Hydro,Kidston,Kidston,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,,,All Hydro,All Hydro,,Kidston,Hydro
Snowy 2.0,Pumped Hydro,NSW,SNSW,Tumut,Committed,,Water,Hydro,Snowy 2.0,Snowy 2.0,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,Hydro,,,All Hydro,All Hydro,,Snowy 2.0,Hydro
Girgarre Solar Farm,Large scale Solar PV,VIC,VIC,Central North Vic,Committed,,Solar,Solar,Girgarre Solar Farm,Girgarre Solar Farm,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,,,All Large scale solar PV,All Large scale solar PV,,Girgarre Solar Farm,Solar
Glenrowan Solar Farm,Large scale Solar PV,VIC,VIC,Central North Vic,Committed,,Solar,Solar,Glenrowan Solar Farm,Glenrowan Solar Farm,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,,,All Large scale solar PV,All Large scale solar PV,,Glenrowan Solar Farm,Solar
Mannum Solar Farm 2*,Large scale Solar PV,SA,CSA,Riverland,Committed,,Solar,Solar,Mannum Solar Farm 2*,Mannum Solar Farm 2*,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,,,All Large scale solar PV,All Large scale solar PV,,Mannum Solar Farm 2*,Solar
Mannum Solar Farm 2,Large scale Solar PV,SA,CSA,Riverland,Committed,,Solar,Solar,Mannum Solar Farm 2,Mannum Solar Farm 2,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,,,All Large scale solar PV,All Large scale solar PV,,Mannum Solar Farm 2,Solar
Metz Solar Farm,Large scale Solar PV,NSW,NNSW,New England,Committed,,Solar,Solar,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,,,All Large scale solar PV,All Large scale solar PV,,Metz Solar Farm,Solar
Riverina Solar Farm,Large scale Solar PV,NSW,SNSW,,Committed,,Solar,Solar,Riverina Solar Farm,Riverina Solar Farm,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,,,All Large scale solar PV,All Large scale solar PV,,Riverina Solar Farm,Solar
Sebastopol Solar Farm,Large scale Solar PV,NSW,SNSW,Wagga Wagga,Committed,,Solar,Solar,Sebastopol Solar Farm,Sebastopol Solar Farm,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,Large scale Solar PV,,,All Large scale solar PV,All Large scale solar PV,,Sebastopol Solar Farm,Solar
Expand Down
8 changes: 4 additions & 4 deletions example_output/6.0/dsp_nsw_summer_green_energy_exports.csv
Original file line number Diff line number Diff line change
@@ -1,7 +1,7 @@
Price band,2023-24,2024-25,2025-26,2026-27,2027-28,2028-29,2029-30,2030-31,2031-32,2032-33,2033-34,2034-35,2035-36,2036-37,2037-38,2038-39,2039-40,2040-41,2041-42,2042-43,2043-44,2044-45,2045-46,2046-47,2047-48,2048-49,2049-50,2050-51,2051-52,2052-53,2053-54
$300 - $500,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0
"$500 - $1,000",0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0
"$1,000 - $7,500",93.74,105.33,117.55,130.37,142.99,193.32,240.22,278.9,317.6,356.3,363.21,369.54,374.3,380.21,386.1,389.85,393.18,397.6,399.67,402.24,405.35,404.66,415.82,426.96,436.15,446.87,457.18,459.5,467.0,475.64,485.41
"$7,500 +",94.74,106.46,118.8,131.76,144.51,195.38,242.78,281.88,320.99,360.1,367.08,373.48,378.3,384.27,390.22,394.01,397.37,401.84,403.94,406.53,409.67,408.97,420.25,431.51,440.81,451.63,462.06,464.4,471.99,480.72,490.59
$500 - $1000,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0
$1000 - $7500,93.74,105.33,117.55,130.37,142.99,193.32,240.22,278.9,317.6,356.3,363.21,369.54,374.3,380.21,386.1,389.85,393.18,397.6,399.67,402.24,405.35,404.66,415.82,426.96,436.15,446.87,457.18,459.5,467.0,475.64,485.41
$7500 +,94.74,106.46,118.8,131.76,144.51,195.38,242.78,281.88,320.99,360.1,367.08,373.48,378.3,384.27,390.22,394.01,397.37,401.84,403.94,406.53,409.67,408.97,420.25,431.51,440.81,451.63,462.06,464.4,471.99,480.72,490.59
Reliability Response,336.75,378.39,422.28,468.34,513.66,694.47,862.96,1001.92,1140.94,1279.96,1304.76,1327.51,1344.63,1365.85,1387.0,1400.47,1412.44,1428.32,1435.77,1444.99,1456.14,1453.66,1493.76,1533.78,1566.81,1605.3,1642.35,1650.67,1677.64,1708.67,1743.76
Reliability response in % of peak demand* ,2.4,2.64,2.87,3.11,3.34,4.41,5.34,6.03,6.7,7.359999999999999,7.359999999999999,7.359999999999999,7.359999999999999,7.359999999999999,7.359999999999999,7.359999999999999,7.359999999999999,7.359999999999999,7.359999999999999,7.359999999999999,7.359999999999999,7.359999999999999,7.5600000000000005,7.8,8.03,8.27,8.5,8.5,8.5,8.5,8.5
Reliability response in % of peak demand,2.4,2.64,2.87,3.11,3.34,4.41,5.34,6.03,6.7,7.359999999999999,7.359999999999999,7.359999999999999,7.359999999999999,7.359999999999999,7.359999999999999,7.359999999999999,7.359999999999999,7.359999999999999,7.359999999999999,7.359999999999999,7.359999999999999,7.359999999999999,7.5600000000000005,7.8,8.03,8.27,8.5,8.5,8.5,8.5,8.5
8 changes: 4 additions & 4 deletions example_output/6.0/dsp_nsw_summer_progressive_change.csv
Original file line number Diff line number Diff line change
@@ -1,7 +1,7 @@
Price band,2023-24,2024-25,2025-26,2026-27,2027-28,2028-29,2029-30,2030-31,2031-32,2032-33,2033-34,2034-35,2035-36,2036-37,2037-38,2038-39,2039-40,2040-41,2041-42,2042-43,2043-44,2044-45,2045-46,2046-47,2047-48,2048-49,2049-50,2050-51,2051-52,2052-53,2053-54
$300 - $500,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0
"$500 - $1,000",0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0
"$1,000 - $7,500",93.74,95.47,97.26,99.67,138.93,190.77,236.72,256.31,275.88,295.44,297.87,300.52,302.65,305.36,307.73,310.75,313.13,316.32,316.85,317.88,319.67,319.09,319.88,320.5,320.06,321.14,322.34,324.64,329.95,333.56,337.9
"$7,500 +",94.74,96.49,98.3,100.74,140.42,192.81,239.25,259.04,278.82,298.59,301.05,303.73,305.88,308.62,311.01,314.06,316.47,319.7,320.23,321.27,323.08,322.5,323.29,323.91,323.47,324.56,325.78,328.1,333.47,337.12,341.5
$500 - $1000,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0
$1000 - $7500,93.74,95.47,97.26,99.67,138.93,190.77,236.72,256.31,275.88,295.44,297.87,300.52,302.65,305.36,307.73,310.75,313.13,316.32,316.85,317.88,319.67,319.09,319.88,320.5,320.06,321.14,322.34,324.64,329.95,333.56,337.9
$7500 +,94.74,96.49,98.3,100.74,140.42,192.81,239.25,259.04,278.82,298.59,301.05,303.73,305.88,308.62,311.01,314.06,316.47,319.7,320.23,321.27,323.08,322.5,323.29,323.91,323.47,324.56,325.78,328.1,333.47,337.12,341.5
Reliability Response,336.74,342.94,349.4,358.05,499.09,685.31,850.38,920.72,991.02,1061.28,1070.04,1079.54,1087.21,1096.93,1105.44,1116.29,1124.85,1136.31,1138.21,1141.89,1148.33,1146.26,1149.08,1151.3,1149.72,1153.61,1157.93,1166.18,1185.25,1198.23,1213.82
Reliability response in % of peak demand* ,2.44,2.44,2.44,2.44,3.35,4.55,5.96,6.39,6.819999999999999,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26
Reliability response in % of peak demand,2.44,2.44,2.44,2.44,3.35,4.55,5.96,6.39,6.819999999999999,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26,7.26