Skip to content

Baseline Scenario Delivery

Past due by about 1 year 66% complete

This is the milestone for the delivery of the model:

  1. POJOs structure should be added.
  2. Grid should be added.
  3. Logic should be refactored.
  4. The baseline scenario should be defined.
Loading