fix(deps): update module github.com/goccy/go-yaml to v1.15.6 #6491
Triggered via pull request
December 2, 2024 20:07
Status
Cancelled
Total duration
1m 14s
Artifacts
–
test.yaml
on: pull_request
Matrix: integration-test / integration-test-all-envs
path-filter
3s
integration-test
/
integration-test
43s
integration-test
/
integration-test-cargo
52s
test
/
test
30s
go-mod-tidy
/
...
/
go-mod-tidy
22s
ghalint
/
ghalint
renovate-config-validator
/
...
/
renovate-config-validator
test-docker-prebuilt
/
test-docker
update-aqua-checksums
/
...
/
update-aqua-checksums
enable-automerge
/
enable-auto-merge
Annotations
16 errors and 1 warning
go-mod-tidy / go-mod-tidy / go-mod-tidy
go.mod and go.sum are changed. A commit is pushed automatically to update them.
|
go-mod-tidy / go-mod-tidy / go-mod-tidy
Process completed with exit code 1.
|
integration-test / integration-test-all-envs (ubuntu-24.04)
Canceling since a higher priority waiting request for 'test-refs/pull/3316/merge' exists
|
integration-test / integration-test-all-envs (ubuntu-24.04)
The operation was canceled.
|
integration-test / integration-test-all-envs (windows-latest)
Canceling since a higher priority waiting request for 'test-refs/pull/3316/merge' exists
|
integration-test / integration-test-all-envs (windows-latest)
The operation was canceled.
|
integration-test / integration-test
Canceling since a higher priority waiting request for 'test-refs/pull/3316/merge' exists
|
integration-test / integration-test
The operation was canceled.
|
test / test
Canceling since a higher priority waiting request for 'test-refs/pull/3316/merge' exists
|
test / test
The operation was canceled.
|
integration-test / integration-test-all-envs (macos-14)
Canceling since a higher priority waiting request for 'test-refs/pull/3316/merge' exists
|
integration-test / integration-test-all-envs (macos-14)
The operation was canceled.
|
integration-test / integration-test-cargo
Canceling since a higher priority waiting request for 'test-refs/pull/3316/merge' exists
|
integration-test / integration-test-cargo
The operation was canceled.
|
integration-test / integration-test-all-envs (macos-13)
Canceling since a higher priority waiting request for 'test-refs/pull/3316/merge' exists
|
integration-test / integration-test-all-envs (macos-13)
The operation was canceled.
|
path-filter
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|