Notifications
You must be signed in to change notification settings - Fork 5
/
MonteCarloV3.R
92 lines (57 loc) · 2.36 KB
/
MonteCarloV3.R
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
#monte carlo simulation example from: http://johnpurchase.com/monte-carlo-with-R.html
setwd("C:/Users/DECC/Documents/Github/R_Excel_link/")#sets the working directory to where the Excel
#model is located
library(excel.link) #loads the excel.link extension library (the first time need to go to Tools,
#Install Packages, and type 'excel.link' in the install wizard 'Packages' field, and install)
library(mc2d) #loads the mc2d two dimensional monte carlo extension package
xl.workbook.open("SimpleModel.xlsx") #opens a specific Excel file
xl.sheet.activate("mc_model") #activates the desired worksheet in the Excel model
#a function for performing montecarlo analysis
monteSim <- function(low, high, conf_int=0.9, n=200){
mu = mean(c(low,high))
z = qnorm(1-(1-conf_int)/2)
s = (high - mu)/z
rnorm(n, mu, s)
}
#use the monteSim function to generate the vectors required for the problem
maintenance = monteSim(xl[e5],xl[f5])
labour = monteSim(xl[e6],xl[f6])
material = monteSim(xl[e7],xl[f7])
production = monteSim(xl[e9],xl[f9])
#assume a correlation between material costs and the level of production
matprod <-cbind(material, production)
plot(matprod) #a plot of the new matrix
matprodcor <- cornode(matprod, target = -0.75, result=TRUE)
plot(matprodcor)
#****create the posterior distribution
posterior.distribution = NULL #set up an empty vector to store the posterior distribution
for (i in 1:length(maintenance)){
#enter the input assumptions from the distribution vectors
xl[h5] = maintenance[i]
xl[h6] = labour[i]
xl[h7] = matprodcor[i,1]
xl[h9] = matprodcor[i,2]
posterior.distribution[i] = xl[i11] #add result to vector
}
#result = (maintenance + labour + material) * production #this is old - ignore
hist(posterior.distribution)
#plot the results
threshold <- function(v, t, low.col="red", high.col="green") {
d = density(v)
l = length(d$x)
n = length(d$x[d$x<t])
plot(d)
x = c(d$x[1:n], d$x[n])
y = c(d$y[1:n], d$y[1])
polygon(x,y, col=low.col)
x = c(d$x[n], d$x[n:l])
y = c(d$y[1], d$y[n:l])
polygon(x, y, col = high.col)
pct = c(length(v[v<t])/length(v), 1 - length(v[v<t])/length(v))
pct = pct * 100
labels = c("below", "above")
labels = paste(labels, pct)
labels = paste(labels, "%", sep="")
legend(min(d$x) ,max(d$y), labels, fill=c(low.col, high.col))
}
threshold(posterior.distribution, 400000)