Skip to content

Cleanups in preparation of GHC 9.8 #3012

Cleanups in preparation of GHC 9.8

Cleanups in preparation of GHC 9.8 #3012

Triggered via pull request December 27, 2024 13:48
@elopezelopez
synchronize #612
elopez:ghc-9.8
Status Cancelled
Total duration 41m 36s
Artifacts 3

build.yml

on: pull_request
bitwuzla-build (win64 target)  /  build
3s
bitwuzla-build (win64 target) / build
Matrix: extra-tests
Matrix: nix-build
build (windows-latest)
4m 19s
build (windows-latest)
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 3 warnings
build (windows-latest)
Process completed with exit code 1.
nix-build (linux-x64)
Canceling since a higher priority waiting request for 'Build-refs/pull/612/merge' exists
nix-build (linux-x64)
The operation was canceled.
bitwuzla-build (win64 target) / build
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
cabal-check
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
extra-tests (ubuntu-latest)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636

Artifacts

Produced during runtime
Name Size
bitwuzla-win64
4.66 MB
hevm-osx-arm64
19.9 MB
hevm-osx-x64
4.48 MB