-
Notifications
You must be signed in to change notification settings - Fork 179
Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
Co-authored-by: Abderrahmane Smimite <[email protected]>
- Loading branch information
1 parent
3411755
commit 086ea2f
Showing
6 changed files
with
174 additions
and
0 deletions.
There are no files selected for viewing
174 changes: 174 additions & 0 deletions
174
backend/library/libraries/risk-matrix-4x4-ebios-rm.yaml
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,174 @@ | ||
urn: urn:intuitem:risk:library:risk-matrix-4x4-ebios-rm | ||
locale: en | ||
ref_id: risk-matrix-4x4-ebios-rm | ||
name: 4x4 risk matrix from EBIOS-RM | ||
description: based on the official guide of the EBIOS RM approach | ||
copyright: public domain | ||
version: 1 | ||
provider: intuitem | ||
packager: intuitem | ||
translations: | ||
fr: | ||
name: Matrice 4x4 EBIOS-RM | ||
description: "Bas\xE9e sur le guide officiel de la m\xE9thode EBIOS RM" | ||
objects: | ||
risk_matrix: | ||
- urn: urn:intuitem:risk:matrix:risk-matrix-4x4-ebios-rm | ||
ref_id: risk-matrix-4x4-ebios-rm | ||
name: 4x4 risk matrix from EBIOS-RM | ||
description: based on the official guide of the EBIOS RM approach | ||
probability: | ||
- id: 0 | ||
abbreviation: V1 | ||
name: V1 - Implausible | ||
description: The source of risk is unlikely to achieve its intended objective | ||
under any of the proposed procedures. The likelihood of the scenario is weak. | ||
translations: | ||
fr: | ||
name: V1 - Peu vraisemblable | ||
description: "La source de risque a peu de chances d\u2019atteindre son\ | ||
\ objectif vis\xE9 selon l\u2019un des modes op\xE9ratoires envisag\xE9\ | ||
s. La vraisemblance du sc\xE9nario est faible." | ||
hexcolor: '#FAF7E9' | ||
- id: 1 | ||
abbreviation: V2 | ||
name: V2 - Plausible | ||
description: ' The source of risk is likely to achieve its intended objective | ||
according to one of the operating procedures envisaged. The likelihood of | ||
the scenario is significant. ' | ||
translations: | ||
fr: | ||
name: V2 - Vraisemblable | ||
description: "La source de risque est susceptible d\u2019atteindre son objectif\ | ||
\ vis\xE9 selon l\u2019un des modes op\xE9ratoires envisag\xE9s. La vraisemblance\ | ||
\ du sc\xE9nario est significative." | ||
hexcolor: '#EEE6BC' | ||
- id: 2 | ||
abbreviation: V3 | ||
name: V3 - Very likely | ||
description: The risk source is very likely to achieve its intended objective | ||
through one of the anticipated methods of operation. The likelihood of the | ||
scenario is high. | ||
translations: | ||
fr: | ||
name: "V3 - Tr\xE8s vraisemblable" | ||
description: "La source de risque va probablement atteindre son objectif\ | ||
\ vis\xE9 selon l\u2019un des modes op\xE9ratoires envisag\xE9s. La vraisemblance\ | ||
\ du sc\xE9nario est \xE9lev\xE9e." | ||
hexcolor: '#DCCC77' | ||
- id: 3 | ||
abbreviation: V4 | ||
name: V4 - Certain | ||
description: The risk source will certainly achieve its intended objective through | ||
one of the anticipated methods of operation OR such a scenario has already | ||
occurred within the organization (incident history). | ||
translations: | ||
fr: | ||
name: V4 - Certain | ||
description: "La source de risque va certainement atteindre son objectif\ | ||
\ vis\xE9 selon l\u2019un des modes op\xE9ratoires envisag\xE9s OU un\ | ||
\ tel sc\xE9nario s\u2019est d\xE9j\xE0 produit au sein de l\u2019organisation\ | ||
\ (historique d\u2019incidents)." | ||
hexcolor: '#C4AA00' | ||
impact: | ||
- id: 0 | ||
abbreviation: G1 | ||
name: G1 - Minor | ||
description: 'No operational impact on the performance of the activity or on | ||
the safety of people and property. ' | ||
translations: | ||
fr: | ||
name: G1 - Mineur | ||
description: "Aucun impact op\xE9rationnel ni sur les performances de l\u2019\ | ||
activit\xE9 ni sur la s\xE9curit\xE9 des personnes et des biens." | ||
hexcolor: '#42C7C4' | ||
- id: 1 | ||
abbreviation: G2 | ||
name: G2 - Significant | ||
description: 'Deterioration in the performance of the activity without impact | ||
on the safety of people and property. ' | ||
translations: | ||
fr: | ||
name: G2 - Significatif | ||
description: "D\xE9gradation des performances de l\u2019activit\xE9 sans\ | ||
\ impacts sur la s\xE9curit\xE9 des personnes et des biens." | ||
hexcolor: '#FBF082' | ||
- id: 2 | ||
abbreviation: G3 | ||
name: G3 - Important | ||
description: 'Sharp deterioration in the performance of the activity, with possible | ||
significant impacts on the safety of people and property. ' | ||
translations: | ||
fr: | ||
name: G3 - Important | ||
description: "Forte d\xE9gradation des performances de l\u2019activit\xE9\ | ||
, avec d\u2019\xE9ventuels impacts significatifs sur la s\xE9curit\xE9\ | ||
\ des personnes et des biens." | ||
hexcolor: '#FFC586' | ||
- id: 3 | ||
abbreviation: G4 | ||
name: G4 - Critique | ||
description: Inability for the company to carry out all or part of its activity, | ||
with possible serious impacts on the safety of people and property. | ||
translations: | ||
fr: | ||
name: G4 - Critique | ||
description: "Incapacit\xE9 pour la soci\xE9t\xE9 d\u2019assurer tout ou\ | ||
\ partie de son activit\xE9, avec d\u2019\xE9ventuels impacts graves sur\ | ||
\ la s\xE9curit\xE9 des personnes et des biens." | ||
hexcolor: '#EE7B86' | ||
risk: | ||
- id: 0 | ||
abbreviation: '1' | ||
name: Low | ||
description: Acceptable as is. | ||
translations: | ||
fr: | ||
name: Faible | ||
description: "Acceptable en l'\xE9tat" | ||
hexcolor: '#59BBB2' | ||
- id: 1 | ||
abbreviation: '2' | ||
name: Medium | ||
description: Tolerable under control. Risk management monitoring must be conducted, | ||
and actions should be implemented as part of continuous improvement in the | ||
medium and long term. | ||
translations: | ||
fr: | ||
name: Moyen | ||
description: "Tol\xE9rable sous contr\xF4le. Un suivi en termes de gestion\ | ||
\ du risque est \xE0 mener et des actions sont \xE0 mettre en place dans\ | ||
\ le cadre d\u2019une am\xE9lioration continue sur le moyen et long terme." | ||
hexcolor: '#F5C481' | ||
- id: 2 | ||
abbreviation: '3' | ||
name: High | ||
description: Unacceptable. Risk reduction measures must be implemented urgently | ||
in the short term. Otherwise, all or part of the activity will be denied. | ||
translations: | ||
fr: | ||
name: "\xC9lev\xE9" | ||
description: "Inacceptable. Des mesures de r\xE9duction du risque doivent\ | ||
\ imp\xE9rativement \xEAtre prises \xE0 court terme. Dans le cas contraire,\ | ||
\ tout ou partie de l\u2019activit\xE9 sera refus\xE9e." | ||
hexcolor: '#E6686D' | ||
grid: | ||
- - 0 | ||
- 0 | ||
- 1 | ||
- 1 | ||
- - 0 | ||
- 0 | ||
- 1 | ||
- 2 | ||
- - 0 | ||
- 1 | ||
- 2 | ||
- 2 | ||
- - 1 | ||
- 1 | ||
- 2 | ||
- 2 | ||
translations: | ||
fr: | ||
description: "Bas\xE9e sur le guide officiel de la m\xE9thode EBIOS RM" |
File renamed without changes.
Binary file not shown.
File renamed without changes.
File renamed without changes.
File renamed without changes.