Skip to content

Fix top contract invocation hook and auth interaction (#1231) #17

Fix top contract invocation hook and auth interaction (#1231)

Fix top contract invocation hook and auth interaction (#1231) #17

Triggered via push November 20, 2023 17:58
Status Cancelled
Total duration 6h 0m 25s
Artifacts

rust.yml

on: push
Matrix: build-and-test
Matrix: cargo-deny
Matrix: publish-dry-run
fmt
14s
fmt
check-git-rev-deps
15s
check-git-rev-deps
complete
0s
complete
Fit to window
Zoom out
Zoom in

Annotations

6 errors
publish-dry-run (ubuntu-latest, wasm32-unknown-unknown) / publish-dry-run
Process completed with exit code 1.
publish-dry-run (ubuntu-latest, x86_64-unknown-linux-gnu) / publish-dry-run
FailFast: cancelling since parallel instance has failed
publish-dry-run (ubuntu-latest, x86_64-unknown-linux-gnu) / publish-dry-run
Process completed with exit code 1.
complete
Process completed with exit code 1.
cackle
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 360 minutes.
cackle
The operation was canceled.