chore(deps): update golang docker tag to v1.23 #3
Konflux Staging / Konflux Staging / rhcl-enterprise-contract / pr group konflux/mintmaker/main/golang-1.x
succeeded
Oct 11, 2024 in 2m 12s
Succeeded
Integration test for snapshot rhcl-fzxf5 and scenario rhcl-enterprise-contract has passed
Details
- Pipelinerun: rhcl-enterprise-contract-444hr
Task | Duration | Test Suite | Status | Details |
---|---|---|---|---|
verify | 1m10s | ✔️ SUCCESS | ✔️ 180 success(es) |
The group snapshot is generated for the component snasphots as below:
Component | Snapshot | BuildPipelineRun | PullRequest |
---|---|---|---|
rhcl-operator | rhcl-n8kx8 | rhcl-operator-on-pull-request-r6w26 | kuadrant-operator |
dns-operator | rhcl-pmt78 | dns-operator-on-pull-request-4zk7x | dns-operator |
limitador-operator | rhcl-kx76d | limitador-operator-on-pull-request-6s2hj | limitador-operator |
Loading