Skip to content

Commit

Permalink
Update sample-evaluation.Rmd
Browse files Browse the repository at this point in the history
  • Loading branch information
koenderks committed Mar 7, 2024
1 parent f466049 commit c9bf9da
Showing 1 changed file with 3 additions and 3 deletions.
6 changes: 3 additions & 3 deletions vignettes/articles/sample-evaluation.Rmd
Original file line number Diff line number Diff line change
Expand Up @@ -271,7 +271,7 @@ summary(result_pp)

In this scenario, the output indicates that the estimated misstatement in the
population is 4.18 percent, with the 95 percent credible interval extending from
3.29 percent to 5.33 percent. Note that this population estimate is considerably
3.28 percent to 5.36 percent. Note that this population estimate is considerably
less uncertain compared to the no pooling approach. Similarly to the no pooling
approach, the stratum estimates differ from each other but are closer together
and exhibit less uncertainty. This can be explained by the fact that the partial
Expand Down Expand Up @@ -424,8 +424,8 @@ print(result)
```

The output indicates that the estimated misstatement in the population is
15.42 percent. The 95 percent credible interval spans from 14.65 percent to
16.3 percent. The precision of the population estimate is therefore 1.65
15.32 percent. The 95 percent credible interval spans from 14.65 percent to
16.29 percent. The precision of the population estimate is therefore 1.64
percent, which is lower than that of the classical approach. The estimates for
each stratum are visualized below using the `plot(..., type = "estimates)`
command but their actual values can be once again be obtained using the
Expand Down

0 comments on commit c9bf9da

Please sign in to comment.