Skip to content

Commit

Permalink
Remvoe verbose
Browse files Browse the repository at this point in the history
Signed-off-by: Danil <[email protected]>
  • Loading branch information
Deniallugo committed Aug 27, 2024
1 parent 5141596 commit dab31e4
Showing 1 changed file with 6 additions and 6 deletions.
12 changes: 6 additions & 6 deletions .github/workflows/ci-zk-toolbox-reusable.yml
Original file line number Diff line number Diff line change
Expand Up @@ -84,10 +84,10 @@ jobs:
- name: Run integration tests
run: |
ci_run zk_supervisor test integration --no-deps --ignore-prerequisites --verbose --chain era &> integration_rollup.log &
ci_run zk_supervisor test integration --no-deps --ignore-prerequisites --chain era &> integration_rollup.log &
PID1=$!
ci_run zk_supervisor test integration --no-deps --ignore-prerequisites --verbose --chain chain_validium &> integration_validium.log &
ci_run zk_supervisor test integration --no-deps --ignore-prerequisites --chain chain_validium &> integration_validium.log &
PID2=$!
wait $PID1
Expand Down Expand Up @@ -133,19 +133,19 @@ jobs:
- name: Run integration tests en
run: |
ci_run zk_supervisor test integration --no-deps --ignore-prerequisites --verbose --external-node --chain era &> integration_en_rollup.log &
ci_run zk_supervisor test integration --no-deps --ignore-prerequisites --external-node --chain era &> integration_en_rollup.log &
PID1=$!
ci_run zk_supervisor test integration --no-deps --ignore-prerequisites --verbose --external-node --chain chain_validium &> integration_en_validium.log &
ci_run zk_supervisor test integration --no-deps --ignore-prerequisites --external-node --chain chain_validium &> integration_en_validium.log &
PID2=$!
wait $PID1
wait $PID2
- name: Run revert tests (external node)
run: |
ci_run zk_supervisor test revert --no-deps --ignore-prerequisites --verbose --chain era &> revert_rollup.log
ci_run zk_supervisor test revert --no-deps --external-node --ignore-prerequisites --verbose --chain chain_validium &> revert_validium.log
ci_run zk_supervisor test revert --no-deps --ignore-prerequisites --chain era &> revert_rollup.log
ci_run zk_supervisor test revert --no-deps --external-node --ignore-prerequisites --chain chain_validium &> revert_validium.log
# Upgrade tests should run last, because as soon as they
# finish the bootloader will be different
Expand Down

0 comments on commit dab31e4

Please sign in to comment.