Skip to content

feat: port mcp2515 to rk3528 #56

feat: port mcp2515 to rk3528

feat: port mcp2515 to rk3528 #56

Triggered via push October 25, 2024 06:19
Status Failure
Total duration 49s
Artifacts 1

release.yml

on: push
Matrix: build-dtbo
release
0s
release
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build-dtbo (linux-rockchip)
Process completed with exit code 2.
build-dtbo (linux-rk356x)
Process completed with exit code 2.
build-dtbo (linux-rk2312)
The job was canceled because "linux-rockchip" failed.
build-dtbo (linux-rk2312)
Process completed with exit code 2.
build-dtbo (linux-stable)
The job was canceled because "linux-rockchip" failed.
build-dtbo (linux-stable)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
overlays
67.2 KB