You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
On Sept 19 (1800 UTC), both CTDs on B1 stopped reporting. Suspect the Inductive Couple Cable (ICC) as they both stopped reporting and Hurricane Jose kicked up some 15-20 foot waves for about 24 hours. CTDs are set to record internally so no data is being lost. Ordering new ICC cables for both buoys (task #74) since realtime CTD data has been crucial for glider ops.
The text was updated successfully, but these errors were encountered:
On Sept 19 (1800 UTC), both CTDs on B1 stopped reporting. Suspect the Inductive Couple Cable (ICC) as they both stopped reporting and Hurricane Jose kicked up some 15-20 foot waves for about 24 hours. CTDs are set to record internally so no data is being lost. Ordering new ICC cables for both buoys (task #74) since realtime CTD data has been crucial for glider ops.
The text was updated successfully, but these errors were encountered: