You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Timeseries of pv production per minute (or daily, weekly, monthly)
Solar irradiation
Outside temp
Other parameters affecting pv production
Treshold for deviation to be activated (e.g. 10% less then expected is warning in report, 30% less is alarm)
Process:
Built Multi-variable model
Make deviation analyses real vs expected
Output:
Timeseries of deviation
Warning or Alert based on level of deviation
Graph:
Lineplot of deviations
The text was updated successfully, but these errors were encountered:
KPI's:
Deviation from expected production
Input:
Timeseries of pv production per minute (or daily, weekly, monthly)
Solar irradiation
Outside temp
Other parameters affecting pv production
Treshold for deviation to be activated (e.g. 10% less then expected is warning in report, 30% less is alarm)
Process:
Built Multi-variable model
Make deviation analyses real vs expected
Output:
Timeseries of deviation
Warning or Alert based on level of deviation
Graph:
Lineplot of deviations
The text was updated successfully, but these errors were encountered: