-
Notifications
You must be signed in to change notification settings - Fork 8
Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
refactor(HMS-4895): use -oci-ta on pr pipeline
Prepare the change for adding the unit test task, by migrating the tasks to -oci-ta which does not require PVC and the ephemeral information is trusted. This change apply to the pullrequest tekton pipeline. https://konflux-ci.dev/architecture/ADR/0036-trusted-artifacts.html Refactor using as guideline the source at: https://github.com/konflux-ci/bazel-builder/blob/main/.tekton/bazel5-ubi8-pull-request.yaml https://issues.redhat.com/browse/HMS-4556 Signed-off-by: Alejandro Visiedo <avisiedo@redhat.com>
- Loading branch information
Showing
1 changed file
with
61 additions
and
36 deletions.
There are no files selected for viewing
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters