Build Test Environment Setup in Colo, document connectivity, and test #807
Labels
Deferred for Next Year
Items deferred to the Next SCaLE
good first issue
help wanted
Needs Round Tuit
Description
We are in the process of building a test environment in Owen's cabinet in HE FMT2. The test environment will terminate the show IPv6 Tunnel except during the show and will provide a limited, but fairly complete simulation of the show network. It's using an SRX-300 router that Owen has lent to the project as well as the 3rd Lenovo server contributed by Bala. One of our ex4200-48p switches is installed there to simulate an IDF switch. One AP is installed and connected to the IDF switch and will provide our standard WiFi networks in a small area near the cabinet.
Acceptance Criteria
The full scope of the configuration, the capabilities and limitations of the simulation, DHCP, DNS, and other services must be configured, documented, and tested.
Currently, the router is believed to be fully configured.
The switch is about 90% configured (AP is attached, and it has uplink capabilities).
There is configuration left to do on Owen's MX-240 to enable the additional VLANs to be trunked through the MX240 to Owen's switch and there may be some minor configuration work left to do on Owen's switch.
This issue will contain notes that can hopefully be eventually turned into more complete documentation.