- Prof. Raghu Reddy, Geeta,Thirumal, Apurv, Saikrishna, Soujanya
- Review of the presentation prepared for 10th January 2015 IIC Meeting
- Plan a roadmap for Integration team for next three months
Here are the changes that has to be made for the presentation
- Slide 2 should be made as slide 1 with some background before going for the status.
- listing out the problems with the labs
- Have a Barchart of the labs at each level
- Remove the Analytics url from the labs status table
- Prepare a table listing out the labs under quality parameters
- List out the best practices for the Integrators