From 18d6ecbb531c364a2f1c97c8004c7db62be2535d Mon Sep 17 00:00:00 2001 From: ctcpip Date: Wed, 13 Nov 2024 16:45:07 -0600 Subject: [PATCH] =?UTF-8?q?=E2=9C=A8=20correct=20reviewers=20stage=20detai?= =?UTF-8?q?ls?= MIME-Version: 1.0 Content-Type: text/plain; charset=UTF-8 Content-Transfer-Encoding: 8bit --- index.html | 4 ++-- 1 file changed, 2 insertions(+), 2 deletions(-) diff --git a/index.html b/index.html index aa8bee3..48f1901 100644 --- a/index.html +++ b/index.html @@ -180,9 +180,9 @@

Spec text

Reviewers

-

Anyone can be a reviewer and submit feedback on an in-process addition. The committee should identify designated reviewers for acceptance during the “draft” (stage 2) maturity stage. These reviewers must give their sign-off before a proposal enters the “candidate” (stage 3) maturity stage. Designated reviewers should not be authors of the spec text for the addition and should have expertise applicable to the subject matter. Designated reviewers must be chosen by the committee, not by the proposal's champion. +

Anyone can be a reviewer and submit feedback on an in-process addition. The committee should identify designated reviewers for acceptance during Stage 2. These reviewers must give their sign-off before a proposal enters Stage 2.7. Designated reviewers should not be authors of the spec text for the addition and should have expertise applicable to the subject matter. Designated reviewers must be chosen by the committee, not by the proposal's champion. -

When reviewers are designated, a target meeting for Stage 3 should be identified. Initial reviewer feedback should be given to the champions two weeks before that meeting to allow for a back-and-forth ahead of the meeting. The target Stage 3 meeting may be delayed by a champion outside of the meeting at a later time if it is not ready. +

When reviewers are designated, a target meeting for Stage 2.7 should be identified. Initial reviewer feedback should be given to the champions two weeks before that meeting to allow for a back-and-forth ahead of the meeting. The target Stage 2.7 meeting may be delayed by a champion outside of the meeting at a later time if it is not ready.

Calls for implementation and feedback