Skip to content

WIP: create_state refact #164

WIP: create_state refact

WIP: create_state refact #164

Triggered via push December 3, 2024 00:47
Status Failure
Total duration 6h 0m 24s
Artifacts

ci.yml

on: push
pre-commit
31s
pre-commit
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

11 errors and 1 warning
pre-commit
Process completed with exit code 1.
tests (3.10)
The job running on runner GitHub Actions 1 has exceeded the maximum execution time of 360 minutes.
tests (3.10)
The operation was canceled.
tests (3.11)
The job running on runner GitHub Actions 8 has exceeded the maximum execution time of 360 minutes.
tests (3.11)
The operation was canceled.
tests (3.12)
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 360 minutes.
tests (3.12)
The operation was canceled.
tests (3.8)
The job running on runner GitHub Actions 4 has exceeded the maximum execution time of 360 minutes.
tests (3.8)
The operation was canceled.
tests (3.9)
The job running on runner GitHub Actions 14 has exceeded the maximum execution time of 360 minutes.
tests (3.9)
The operation was canceled.
pre-commit
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636