You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
It would be great to be able to assign versions to contracts. So if i report time ona an issue, the time is added on all contracts this version is assigned to.
Assigning issues directly is only possible if not already assigned by a version.
Time per issues is only added one time, also if more than one version or seperate issues asre assigned directly via versions more often.
The text was updated successfully, but these errors were encountered:
It would be great to be able to assign versions to contracts. So if i report time ona an issue, the time is added on all contracts this version is assigned to.
Assigning issues directly is only possible if not already assigned by a version.
Time per issues is only added one time, also if more than one version or seperate issues asre assigned directly via versions more often.
The text was updated successfully, but these errors were encountered: