Notifications
You must be signed in to change notification settings - Fork 1
/
Copy pathLiquid_CF_1.tex
250 lines (239 loc) · 11.7 KB
/
Liquid_CF_1.tex
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
\input{common/standard_preamble}
\title{
\Huge Unnamed Liquid Rocket Engine\\
Cold Flow 1\\
\vspace{1cm}
\Large Cold Flow Test Operations Procedures}
%begin operators definitions -- {{{
\operator{ops}{Blue}{OPS}{Operations Director}
\operator{primary}{Fuchsia}{PRIMARY}{Primary Fill Operator}
\operator{secondary}{Emerald}{SECONDARY}{Secondary Fill Operator}
\operator{daq}{OliveGreen}{DAQ}{DAQ Technician}
\operator{control}{Maroon}{CONTROL}{Control System Operator}
\operator{peri}{red}{P1}{Perimeter Guard 1}
\operator{perii}{red}{P2}{Perimeter Guard 2}
\operator{periii}{red}{P3}{Perimeter Guard 3}
%end operators definitions -- }}}}}
\begin{document}
\input{common/standard_titlepage}
\section{Cold Flow Test Operations Procedures}
% begin contents subsection -- {{{
\subsection{Contents}
This document contains the following procedure:
\begin{itemize}
\item The \textit{Cold Flow Test} procedure comprises steps for conducting a cold flow test of the engine and fill system using the electrical control system and motorized ball valves.
\end{itemize}
% end contents subsection -- }}}
% begin personnel required section -- {{{
\subsection{Personnel Required}
The test operations team consists of nine personnel:
\begin{checklist}
\item The \opsfull{} directs operations procedures and communicates with the other test personnel.
\item The \primaryfull{} is the main system operator. \primary{} operates all manual valves as well as the test control system.
\item The \secondaryfull{} is the backup for \primary{}, and communicates with OPS. If \primary{} becomes incapacitated, \secondary{} is responsible for removing them from danger.
\item The \daqfull{} monitors and operates the test data acquisition system.
\item The \controlfull{} operates the test control system, including actuation of remote valves.
\item \perifull{}, \periifull{}, and \periiifull{} ensure that no unauthorized personnel enter the testing area during test operations.
\end{checklist}
\setcounter{checklistnum}{0}
% end personnel required section -- }}}
% begin background information section -- {{{
\subsection{Background Information}
All personnel should familiarize themselves with the following information prior to test start:
\begin{itemize}
\item All electrically actuated valves have two names: an alphanumeric code used in the plumbing master system, and a descriptive name used in control system code and documentation. For this test, the correspondence is as follows:
\begin{itemize}
\item \textbf{MV-1} is the \textbf{Remote Fill Valve}
\item \textbf{MV-2} is the \textbf{Pressurant Valve}
\item \textbf{MV-3} is the \textbf{Motorized Vent Valve}
\end{itemize}
\end{itemize}
% end background information section -- }}}
% begin sign off -- {{{
\subsection{Sign-Off}
\textit{To be completed by all test personnel after reading and familiarization with procedures}
\begin{checklist}
\item \opsfull \tabto{25em}\rule{10em}{0.4pt}\hspace{5em}\rule{10em}{0.4pt}
\item \primaryfull \tabto{25em}\rule{10em}{0.4pt}\hspace{5em}\rule{10em}{0.4pt}
\item \secondaryfull\tabto{25em}\rule{10em}{0.4pt}\hspace{5em}\rule{10em}{0.4pt}
\item \daqfull \tabto{25em}\rule{10em}{0.4pt}\hspace{5em}\rule{10em}{0.4pt}
\item \controlfull \tabto{25em}\rule{10em}{0.4pt}\hspace{5em}\rule{10em}{0.4pt}
\item \perifull \tabto{25em}\rule{10em}{0.4pt}\hspace{5em}\rule{10em}{0.4pt}
\item \periifull \tabto{25em}\rule{10em}{0.4pt}\hspace{5em}\rule{10em}{0.4pt}
\item \periiifull \tabto{25em}\rule{10em}{0.4pt}\hspace{5em}\rule{10em}{0.4pt}
\end{checklist}
\setcounter{checklistnum}{0}
% end sign off -- }}}
\newpage
% begin prior to start section -- {{{
\subsection{Prior to Start}
\begin{checklist}
\item Ensure that the following procedures are complete:
\begin{checklist}
\item Oxidizer Tank Assembly procedure
\item Plumbing Setup procedure
\item Oxidizer Tank Stand Setup procedure
\item Tank Heating Setup procedure
\item Test Stand Setup procedure
\item Data Acquisition Setup procedure
\item Test Control System Setup procedure
\end{checklist}
\item Ensure that all technicians as defined above are available and have completed the sign-off.
\item Ensure that all spectators and test personnel are wearing safety glasses.
\item Ensure that \primary{} and \secondary{} are wearing face shields and have no exposed skin.
\item Ensure that \primary{} is wearing thermal gloves.
\item Ensure that \ops{} is in possession of the system control key.
\end{checklist}
\setcounter{checklistnum}{0}
% end prior to start section -- }}}
\newpage
% begin Cold Flow Test Procedure section -- {{{
\subsection{Cold Flow Test Procedure}
\begin{checklist}
\item \primary{}: Confirm that the following valves are initially closed:
\begin{checklist}
\item BA-1
\item BA-3
\item BA-5
\item BA-6
\item BA-9
\item MV-1
\item MV-2
\item MV-3
\end{checklist}
\item \primary{}: Confirm that the following valves are initially open:
\begin{checklist}
\item BA-2
\item BA-4
\end{checklist}
\item \daq{}: Confirm that all pressure transducers are reading atmospheric pressure.
\item \daq{}: Confirm that all load cells are reading the determined zero point.
\item \textbf{\textit{PAUSE POINT}}
\item \peri{}, \perii{}, and \periii{}: Close the perimeter and do not allow any further personnel to enter the testing area.
\item \secondary: Confirm that no personnel are present in the testing area other than \primary{} and \secondary.
\item \primary{}: Slowly open GA-1 through $\frac{3}{4}$ of a turn.
\begin{checklist}[label=$\bullet$]
\item If leaks are observed:
\begin{checklist}
\item \primary{}: Close GA-1.
\item \primary{}: TODO
\end{checklist}
\end{checklist}
\item \primary{}: Adjust CV-4 to 360 psi.
\item \daq{}: Communicate the pressure reading of PT-1.
\item \ops{}: Record the pressure reading of PT-1.
\item \primary{}: Communicate the pressure readings of PI-3 and PI-4.
\item \ops{}: Record the pressure readings of PI-3 and PI-4.
\item \primary{} and \secondary{}: Retreat back to Mission Control.
\item \control{}: Perform the following control system checks:
\begin{checklist}
\item Confirm that all actuator controls are in the ``closed'' position:
\begin{checklist}
\item Remote Fill Valve
\item Motorized Vent Valve
\item Pressurant Valve
\end{checklist}
\end{checklist}
\item \textbf{\textit{PAUSE POINT}}
\item \ops{}: Poll the following personnel for GO/NO GO status:
\begin{checklist}
\item \control{}
\item \daq{}
\item \primary{}
\item \secondary{}
\item \peri{}
\item \perii{}
\item \periii{}
\end{checklist}
\item \ops{}: Give the system control key to \control{}.
\item \control{}: Engage the key switch and power on the control boxes.
\item \control{}: Open the Pressurant Valve.
\item \daq{}: Monitor PT-1 and the fuel tank load cell during fuel pressurization.
\item \daq{}: Proceed when the fuel tank mass is stable.
\item \textbf{\textit{PAUSE POINT}}
\item \primary{}: Conduct the cold flow test by opening BA-9 using the ropes.
\item \ops{}: Proceed when water flow has ceased or after 15 seconds have elapsed.
\item \control{}: Close the Pressurant Valve.
\item \textbf{\textit{PAUSE POINT}}
\item \daq{}: Confirm that PT-1 is reading atmospheric pressure.
\item \control{}: Disengage the key switch and disable actuators.
\item \primary{} and \secondary{}: Approach the test plumbing.
\item \primary{}: Close BA-2.
\item \primary{}: Open BA-1.
\item \primary{}: Adjust CV-4 to 600 psi.
\item \primary{}: Disconnect the pressure relief valve assembly from the fuel plumbing and connect it to the oxidizer plumbing.
\item \daq{}: Communicate the pressure reading of PT-1.
\item \ops{}: Record the pressure reading of PT-1.
\item \primary{}: Communicate the pressure readings of PI-3 and PI-4.
\item \ops{}: Record the pressure readings of PI-3 and PI-4.
\item \primary{}: Remove the cap from SC-1.
\item \primary{}: Connect the fill line to SC-1, hand tighten, and then tighten with a wrench. Do not force the connection.
\item \primary{}: Slowly open the Cylinder Valve through $\frac{3}{4}$ of a turn.
\begin{checklist}[label=$\bullet$]
\item If leaks are observed:
\begin{checklist}
\item \primary{}: Close the Cylinder Valve.
\item \primary{}: Slowly open BA-3.
\item \primary{}: Slowly open BA-5.
\item \daq{}: Confirm that PT-2 is reading atmospheric pressure.
\item \ops{}: Abort test procedures and revisit plumbing setup.
\end{checklist}
\end{checklist}
\item \primary{}: Communicate the reading of PI-2.
\item \daq{}: Communicate the reading of PT-2.
\item \daq{}: Confirm that the two pressure measurements are in agreement.
\item \primary{} and \secondary{}: Retreat back to Mission Control.
\item \control{}: Perform the following control system checks:
\begin{checklist}
\item Confirm that all actuator controls are in the ``closed'' position:
\begin{checklist}
\item Remote Fill Valve
\item Motorized Vent Valve
\item Pressurant Valve
\end{checklist}
\end{checklist}
\item \textbf{\textit{PAUSE POINT}}
\item \ops: Give the system control key to \control{}.
\item \control{}: Engage the key switch and power on the control boxes.
\item \control{}: Open the Motorized Vent Valve.
\item \control{}: Open the Remote Fill Valve.
\begin{checklist}[label=$\bullet$]
\item If leaks are observed:
\begin{checklist}
\item \control{}: Close the Remote Fill Valve.
\item \primary{}: Open BA-6 using the ropes.
\item \ops: Proceed only when the oxidizer tank has fully vented.
\item \primary{}: Close the Cylinder Valve.
\item \daq{}: Confirm that the Fill Pressure Transducer is reading atmospheric pressure.
\item \ops{}: Abort test procedures and revisit plumbing setup.
\end{checklist}
\end{checklist}
\item \ops{}: Proceed only when a white plume is visible from the vent plug.
\item \control{}: Close the Motorized Vent Valve.
\item \control{}: Close the Remote Fill Valve.
\item \control{}: Open the Pressurant Valve.
\item \daq{}: Proceed when PT-1 is stable at 600 psi.
\item \textbf{\textit{PAUSE POINT}}
\item \primary{}: Conduct the cold flow test by opening BA-6 using the ropes.
\item \ops{}: Proceed when carbon dioxide flow has ceased or after 15 seconds have elapsed.
\item \control{}: Close the Pressurant Valve.
\item \textbf{\textit{PAUSE POINT}}
\item \ops{}: Proceed only when the oxidizer tank has fully vented.
\item \daq{}: Confirm that PT-1 is reading atmospheric pressure.
\item \control{}: Open the Motorized Vent Valve.
\item \primary{} and \secondary{}: Approach the test plumbing.
\item \primary{}: Close the Cylinder Valve.
\item \primary{}: Slowly open BA-3.
\item \control{}: Open the Remote Fill Valve.
\item \primary{}: Close GA-1.
\item \control{}: Open MV-2.
\item \primary{}: Slowly open BA-2.
\item \primary{}: Slowly open BA-5.
\item \primary{}: Disconnect the fill line from SC-1.
\item \primary{}: Replace the cap on SC-1.
\item \daq{}: Confirm that all pressure transducers are reading atmospheric pressure.
\item \peri{}, \perii{}, and \periii{}: Open the perimeter.
\item \ops{}: Proceed with teardown and disassembly.
\end{checklist}