Notifications
You must be signed in to change notification settings - Fork 1
/
Copy pathUXO_CF_2.tex
executable file
·323 lines (309 loc) · 16.3 KB
/
UXO_CF_2.tex
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
\input{common/standard_preamble}
\title{
\Huge UXO Hybrid Rocket Engine\\
Cold Flow 2\\
\vspace{1cm}
\Large Cold Flow Test Operations Procedures}
%begin operators definitions -- {{{
\operator{ops}{blue}{OPS}{Operations Director}
\operator{primary}{Plum}{PRIMARY}{Primary Fill Operator}
\operator{secondary}{cyan}{SECONDARY}{Secondary Fill Operator}
\operator{daq}{olive}{DAQ}{DAQ Technician}
\operator{heat}{orange}{HEAT}{Heating Technician}
\operator{peri}{red}{P1}{Perimeter Guard 1}
\operator{perii}{red}{P2}{Perimeter Guard 2}
%end operators definitions -- }}}}}
\begin{document}
\input{common/standard_titlepage}
\section{Cold Flow Test Operations Procedures}
% begin contents subsection -- {{{
\subsection{Contents}
This document contains two procedures:
\begin{itemize}
\item The \textit{Cold Flow Test – Remote Control} procedure comprises steps for operating the fill system using the electrical control system and motorized ball valves.
\item The \textit{Cold Flow Test – Manual Control} procedure comprises steps for operating the fill system using manually operated ball valves.
\end{itemize}
% end contents subsection -- }}}
% begin personnel required section -- {{{
\subsection{Personnel Required}
The test operations team consists of seven personnel:
\begin{checklist}
\item The \opsfull{} directs operations procedures and communicates with the other test personnel.
\item The \primaryfull{} is the main system operator. \primary{} operates all manual valves as well as the test control system.
\item The \secondaryfull{} is the backup for \primary{}, and communicates with OPS. If \primary{} becomes incapacitated, \secondary{} is responsible for removing them from danger.
\item The \daqfull{} monitors and operates the test data acquisition system.
\item The \heatfull{} operates the valves for the tank heating system.
\item \perifull{} and \periifull{} ensure that no unauthorized personnel enter the testing area during test operations.
\end{checklist}
\setcounter{checklistnum}{0}
% end personnel required section -- }}}
% begin sign off -- {{{
\subsection{Sign-Off}
\textit{To be completed by all test personnel after reading and familiarization with procedures}
\begin{checklist}
\item \opsfull \tabto{25em}\rule{10em}{0.4pt}\hspace{5em}\rule{10em}{0.4pt}
\item \primaryfull \tabto{25em}\rule{10em}{0.4pt}\hspace{5em}\rule{10em}{0.4pt}
\item \secondaryfull\tabto{25em}\rule{10em}{0.4pt}\hspace{5em}\rule{10em}{0.4pt}
\item \daqfull \tabto{25em}\rule{10em}{0.4pt}\hspace{5em}\rule{10em}{0.4pt}
\item \heatfull \tabto{25em}\rule{10em}{0.4pt}\hspace{5em}\rule{10em}{0.4pt}
\item \perifull \tabto{25em}\rule{10em}{0.4pt}\hspace{5em}\rule{10em}{0.4pt}
\item \periifull \tabto{25em}\rule{10em}{0.4pt}\hspace{5em}\rule{10em}{0.4pt}
\end{checklist}
\setcounter{checklistnum}{0}
% end sign off -- }}}
\newpage
% begin prior to start section -- {{{
\subsection{Prior to Start}
\begin{checklist}
\item Ensure that the following procedures are complete:
\begin{checklist}
\item Oxidizer Tank Assembly procedure
\item Plumbing Setup procedure
\item Oxidizer Tank Stand Setup procedure
\item Tank Heating Setup procedure
\item Test Stand Setup procedure
\item Data Acquisition Setup procedure
\item Test Control System Setup procedure
\end{checklist}
\item Ensure that all technicians as defined above are available and have completed the sign-off.
\item Ensure that the following personnel have walkie-talkies and communication is functional:
\begin{checklist}
\item \ops{}
\item \secondary
\item \daq{}
\item \heat
\item \peri{}
\item \perii{}
\end{checklist}
\item Ensure that all spectators and test personnel are wearing safety glasses.
\item Ensure that \primary{} and \secondary are wearing face shields and have no exposed skin.
\item Ensure that \primary{} is wearing thermal gloves.
\item Ensure that \secondary is in possession of the system control key.
\end{checklist}
\setcounter{checklistnum}{0}
% end prior to start section -- }}}
\newpage
% begin Remote Control Procedure section -- {{{
\subsection{Cold Flow Test - Remote Control Procedure}
\begin{checklist}
\item \primary{}: Confirm that the following valves are initially closed:
\begin{checklist}
\item Cylinder Valve
\item Remote Fill Valve
\item Parallel Fill Valve
\item Tank Vent Valve
\item Pressure Relief Valve
\item Line Vent Valve
\item Shutoff Valve
\end{checklist}
\item \primary{}: Confirm that the following valves are initially open:
\begin{checklist}
\item Series Fill Valve
\end{checklist}
\item \daq{}: Confirm that all pressure transducers are reading atmospheric pressure.
\item \daq{}: Confirm that all load cells are reading the determined zero point.
\item \textbf{\textit{PAUSE POINT}}
\item \peri{} and \perii{}: Close the perimeter and do not allow any further personnel to enter the testing area.
\item \secondary: Confirm that no personnel are present in the testing area other than \primary{} and \secondary.
\item \primary{}: Remove the cap from the carbon dioxide supply cylinder.
\item \primary{}: Connect the fill line to the supply cylinder, hand tighten, and then tighten with a wrench. Do not force the connection.
\item \primary{}: Slowly open the Cylinder Valve through ¾ of a turn.
\begin{checklist}[label=$\bullet$]
\item If leaks are observed:
\begin{checklist}
\item \primary{}: Close the Cylinder Valve.
\item \primary{}: Open the Shutoff Valve using the ropes.
\item \primary{}: Slowly open the Parallel Fill Valve.
\item \daq{}: Confirm that the fill lines are fully depressurized.
\item \ops{}: Abort test procedures and revisit plumbing setup.
\end{checklist}
\end{checklist}
\item \primary{}: Communicate the supply cylinder pressure as visible on the Pressure Gauge.
\item \daq{}: Communicate the supply cylinder pressure as read by the Fill Pressure Transducer.
\item \daq{}: Confirm that the two pressure measurements are in agreement.
\item \heat: Close the Tank Heating Valve.
\item \primary: Move the tank heating hose from the drain to the oxidizer tank water jacket.
\item \heat: Partially open the Tank Heating Valve, allowing water to flow at a minimal rate.
\item \primary{} and \secondary: Retreat to the test control area, behind the blast shield.
\item \primary{}: Perform the following control system checks:
\begin{checklist}
\item Confirm that all actuator controls are in the ``off'' position:
\begin{checklist}
\item Remote Fill Valve
\item Tank Vent Valve
\end{checklist}
\end{checklist}
\item \textbf{\textit{PAUSE POINT}}
\item \ops{}: Poll the following personnel for GO/NO GO status:
\begin{checklist}
\item \peri{}
\item \perii{}
\item \heat
\item \daq{}
\item \primary{}
\item \secondary
\end{checklist}
\item \secondary: Give the system control key to \primary{}.
\item \primary{}: Engage the key switch and power on the control boxes.
\item \primary{}: Open the Tank Vent Valve.
\item \primary{}: Open the Remote Fill Valve.
\begin{checklist}[label=$\bullet$]
\item If leaks are observed:
\begin{checklist}
\item \primary{}: Close the Remote Fill Valve.
\item \primary{}: Open the Shutoff Valve using the ropes.
\item \secondary: Proceed only when the oxidizer tank has fully vented.
\item \primary{} and \secondary: Approach the test plumbing.
\item \primary{}: Close the Cylinder Valve.
\item \primary{}: Open the Remote Fill Valve.
\item \daq{}: Confirm that the Fill Pressure Transducer is reading atmospheric pressure.
\item \ops{}: Abort test procedures and revisit plumbing setup.
\end{checklist}
\item If the Remote Fill Valve fails to open:
\begin{checklist}
\item \ops{}: Proceed to the Manual Control procedure.
\end{checklist}
\end{checklist}
\item \secondary{}: Proceed only when a white plume is visible from the Tank Vent Valve.
\item \primary{}: Close the Tank Vent Valve.
\item \primary{}: Close the Remote Fill Valve.
\begin{checklist}[label=$\bullet$]
\item If the Remote Fill Valve fails to close:
\begin{checklist}
\item \primary{} and \secondary: Approach the test plumbing.
\item \primary{}: Close the Series Fill Valve.
\item \primary{} and \secondary: Retreat to the test control area, behind the blast shield.
\end{checklist}
\end{checklist}
\item \heat: Open the Tank Heating Valve.
\item \daq{}: Proceed only when the oxidizer tank pressure is at least 500 psi.
\begin{checklist}[label=$\bullet$]
\item If the oxidizer tank pressure does not reach 500 psi:
\begin{checklist}
\item \heat: Close the Tank Heating Valve.
\item \primary{}: Open the Shutoff Valve using the ropes.
\item \secondary: Proceed only when the oxidizer tank has fully vented.
\item \primary{} and \secondary: Approach the test plumbing.
\item \primary{}: Close the Cylinder Valve.
\item \primary{}: Open the Remote Fill Valve.
\item \daq{}: Confirm that the Oxidizer Tank Pressure Transducer is reading atmospheric pressure.
\item \ops{}: Abort test procedures and revisit plumbing setup.
\end{checklist}
\end{checklist}
\item \heat: Close the Tank Heating Valve.
\item \textbf{\textit{PAUSE POINT}}
\item \primary{}: Conduct the cold flow test by opening the Shutoff Valve using the ropes.
\item \textbf{\textit{PAUSE POINT}}
\item \ops{}: Wait for at least 3 minutes before proceeding.
\item \daq{}: Confirm that the Oxidizer Tank Pressure Transducer is reading atmospheric pressure.
\item \primary{}: Open the Tank Vent Valve.
\item \primary{} and \secondary: Approach the test plumbing.
\item \primary{}: Close the Cylinder Valve.
\item \primary{}: Open the Remote Fill Valve.
\item \primary{}: Disconnect the fill line from the supply cylinder.
\item \primary{}: Replace the cap on the carbon dioxide supply cylinder.
\item \daq{}: Confirm that the Fill Pressure Transducer is reading atmospheric pressure.
\item \ops{}: Wait for at least 3 minutes before proceeding.
\item \peri{} and \perii{}: Open the perimeter.
\item \ops{}: Proceed with teardown and disassembly.
\end{checklist}
\setcounter{checklistnum}{0}
% end Remote Control Procedure section -- }}}
\newpage
% begin Manual Control Procedure section -- {{{
\subsection{Cold Flow Test - Remote Control Procedure}
\begin{checklist}
\item \primary{}: Confirm that the following valves are initially closed:
\begin{checklist}
\item Cylinder Valve
\item Remote Fill Valve
\item Parallel Fill Valve
\item Pressure Relief Valve
\item Line Vent Valve
\item Shutoff Valve
\item Series Fill Valve
\end{checklist}
\item \primary{}: Confirm that the following valves are initially open:
\item Tank Vent Valve
\item \daq{}: Confirm that all pressure transducers are reading atmospheric pressure.
\item \daq{}: Confirm that all load cells are reading the determined zero point.
\item \textbf{\textit{PAUSE POINT}}
\item \peri{} and \perii{}: Close the perimeter and do not allow any further personnel to enter the testing area.
\item \secondary: Confirm that no personnel are present in the testing area other than \primary{} and \secondary.
\item \primary{}: Remove the cap from the carbon dioxide supply cylinder.
\item \primary{}: Connect the fill line to the supply cylinder, hand tighten, and then tighten with a wrench. Do not force the connection.
\item \primary{}: Slowly open the Cylinder Valve through ¾ of a turn.
\begin{checklist}[label=$\bullet$]
\item If leaks are observed:
\begin{checklist}
\item \primary{}: Close the Cylinder Valve.
\item \primary{}: Open the Shutoff Valve using the ropes.
\item \primary{}: Slowly open the Parallel Fill Valve.
\item \daq{}: Confirm that the fill lines are fully depressurized.
\item \ops{}: Abort test procedures and revisit plumbing setup.
\end{checklist}
\end{checklist}
\item \primary{}: Communicate the supply cylinder pressure as visible on the Pressure Gauge.
\item \daq{}: Communicate the supply cylinder pressure as read by the Fill Pressure Transducer.
\item \daq{}: Confirm that the two pressure measurements are in agreement.
\item \heat: Close the Tank Heating Valve.
\item \primary: Move the tank heating hose from the drain to the oxidizer tank water jacket.
\item \heat: Partially open the Tank Heating Valve, allowing water to flow at a minimal rate.
\item \textbf{\textit{PAUSE POINT}}
\item \ops{}: Poll the following personnel for GO/NO GO status:
\begin{checklist}
\item \peri{}
\item \perii{}
\item \heat
\item \daq{}
\item \primary{}
\item \secondary
\end{checklist}
\item \primary{}: Open the Series Fill Valve.
\begin{checklist}[label=$\bullet$]
\item If leaks are observed:
\begin{checklist}
\item \primary{}: Close the Series Fill Valve.
\item \primary{}: Open the Shutoff Valve using the ropes.
\item \secondary: Proceed only when the oxidizer tank has fully vented.
\item \primary{}: Close the Cylinder Valve.
\item \primary{}: Open the Remote Fill Valve.
\item \daq{}: Confirm that the Fill Pressure Transducer is reading atmospheric pressure.
\item \ops{}: Abort test procedures and revisit plumbing setup.
\end{checklist}
\end{checklist}
\item \secondary{}: Proceed only when a white plume is visible from the Tank Vent Valve.
\item \heat: Open the Tank Heating Valve.
\item \daq{}: Proceed only when the oxidizer tank pressure is at least 500 psi.
\begin{checklist}[label=$\bullet$]
\item If the oxidizer tank pressure does not reach 500 psi:
\begin{checklist}
\item \heat: Close the Tank Heating Valve.
\item \primary{}: Open the Shutoff Valve using the ropes.
\item \secondary: Proceed only when the oxidizer tank has fully vented.
\item \primary{} and \secondary: Approach the test plumbing.
\item \primary{}: Close the Cylinder Valve.
\item \primary{}: Slowly open the Series Fill Valve.
\item \daq{}: Confirm that the Oxidizer Tank Pressure Transducer is reading atmospheric pressure.
\item \ops{}: Abort test procedures and revisit plumbing setup.
\end{checklist}
\end{checklist}
\item \heat: Close the Tank Heating Valve.
\item \textbf{\textit{PAUSE POINT}}
\item \primary{}: Conduct the cold flow test by opening the Shutoff Valve using the ropes.
\item \textbf{\textit{PAUSE POINT}}
\item \ops{}: Wait for at least 3 minutes before proceeding.
\item \daq{}: Confirm that the Oxidizer Tank Pressure Transducer is reading atmospheric pressure.
\item \primary{}: Open the Tank Vent Valve.
\item \primary{} and \secondary: Approach the test plumbing.
\item \primary{}: Close the Cylinder Valve.
\item \primary{}: Slowly open the Series Fill Valve.
\item \primary{}: Disconnect the fill line from the supply cylinder.
\item \primary{}: Replace the cap on the carbon dioxide supply cylinder.
\item \daq{}: Confirm that the Fill Pressure Transducer is reading atmospheric pressure.
\item \ops{}: Wait for at least 3 minutes before proceeding.
\item \peri{} and \perii{}: Open the perimeter.
\item \ops{}: Proceed with teardown and disassembly.
\end{checklist}
% end Manual Control Procedure section -- }}}
\end{document}