Skip to content

dockerfile: Add poetry lock before export for wss-proxy #12535

dockerfile: Add poetry lock before export for wss-proxy

dockerfile: Add poetry lock before export for wss-proxy #12535

Triggered via push March 6, 2025 00:25
Status Failure
Total duration 1h 9m 29s
Artifacts 4

ci.yaml

on: push
Matrix: compile
Run fuzz regression tests
8m 53s
Run fuzz regression tests
Matrix: Run unit tests
Matrix: Sanitizers Test CLN
Matrix: integration-valgrind
Matrix: integration
Matrix: min-btc-support
Update examples in doc schemas
5m 29s
Update examples in doc schemas
CI completion
0s
CI completion
Fit to window
Zoom out
Zoom in

Annotations

28 errors
Valgrind Test CLN Valgrind (09/10)
Process completed with exit code 1.
Valgrind Test CLN Valgrind (05/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
Valgrind Test CLN Valgrind (05/10)
The operation was canceled.
Valgrind Test CLN Valgrind (02/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
Valgrind Test CLN Valgrind (02/10)
The operation was canceled.
Valgrind Test CLN Valgrind (04/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
Valgrind Test CLN Valgrind (04/10)
The operation was canceled.
Valgrind Test CLN Valgrind (07/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
Valgrind Test CLN Valgrind (07/10)
The operation was canceled.
Valgrind Test CLN Valgrind (03/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
Valgrind Test CLN Valgrind (03/10)
The operation was canceled.
Valgrind Test CLN Valgrind (08/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
Valgrind Test CLN Valgrind (08/10)
The operation was canceled.
Valgrind Test CLN Valgrind (10/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
Valgrind Test CLN Valgrind (10/10)
The operation was canceled.
Valgrind Test CLN Valgrind (01/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
Valgrind Test CLN Valgrind (01/10)
The operation was canceled.
Valgrind Test CLN Valgrind (06/10)
The job was canceled because "Valgrind__09_10__--test-g" failed.
Valgrind Test CLN Valgrind (06/10)
The operation was canceled.
Test CLN liquid
Process completed with exit code 1.
Test CLN splicing
The job was canceled because "liquid_compile-gcc_gcc_li" failed.
Test CLN splicing
The operation was canceled.
Test CLN gcc
The job was canceled because "liquid_compile-gcc_gcc_li" failed.
Test CLN gcc
The operation was canceled.
Test CLN postgres
The job was canceled because "liquid_compile-gcc_gcc_li" failed.
Test CLN postgres
The operation was canceled.
Test CLN clang
The job was canceled because "liquid_compile-gcc_gcc_li" failed.
Test CLN clang
The operation was canceled.

Artifacts

Produced during runtime
Name Size
cln-compile-clang-sanitizers.tar.bz2
200 MB
cln-compile-clang.tar.bz2
137 MB
cln-compile-gcc-O3.tar.bz2
170 MB
cln-compile-gcc.tar.bz2
136 MB