Add Tetris Gymnasium to third party environments #9
run-pytest.yml
on: pull_request
build-necessary
54s
Matrix: build-all
Annotations
12 errors
build-all (3.11, >=2.0)
The job running on runner GitHub Actions 16 has exceeded the maximum execution time of 360 minutes.
|
build-all (3.11, >=2.0)
The operation was canceled.
|
build-all (3.10, >=2.0)
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 360 minutes.
|
build-all (3.10, >=2.0)
The operation was canceled.
|
build-all (3.11, >=1.21,<2.0)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 360 minutes.
|
build-all (3.11, >=1.21,<2.0)
The operation was canceled.
|
build-all (3.12, >=2.0)
The job running on runner GitHub Actions 11 has exceeded the maximum execution time of 360 minutes.
|
build-all (3.12, >=2.0)
The operation was canceled.
|
build-all (3.12, >=1.21,<2.0)
The job running on runner GitHub Actions 14 has exceeded the maximum execution time of 360 minutes.
|
build-all (3.12, >=1.21,<2.0)
The operation was canceled.
|
build-all (3.10, >=1.21,<2.0)
The job running on runner GitHub Actions 13 has exceeded the maximum execution time of 360 minutes.
|
build-all (3.10, >=1.21,<2.0)
The operation was canceled.
|