Skip to content

fix: allow for both linear and quadratic dissipation functions with SpectralSplit #5940

fix: allow for both linear and quadratic dissipation functions with SpectralSplit

fix: allow for both linear and quadratic dissipation functions with SpectralSplit #5940

Triggered via pull request July 3, 2024 21:18
Status Cancelled
Total duration 9m 5s
Billable time 7m
Artifacts

ci_tests.yml

on: pull_request
is_not_draft_pull_request
5s
is_not_draft_pull_request
Matrix: cpu_builds
Matrix: check_code_style_and_documentation
Matrix: cuda_builds
if_not_unassigned_pull_request
1s
if_not_unassigned_pull_request
are_submodules_in_sync
13s
are_submodules_in_sync
baseline_log
5s
baseline_log
code_coverage  /  build_test_deploy
6m 27s
code_coverage / build_test_deploy
run_integrated_tests  /  build_test_deploy
run_integrated_tests / build_test_deploy
check_that_all_jobs_succeeded
0s
check_that_all_jobs_succeeded
Fit to window
Zoom out
Zoom in

Annotations

21 errors
if_not_unassigned_pull_request
Process completed with exit code 1.
Centos (7.7, gcc 8.3.1, open-mpi 1.10.7, cuda 11.8.89) / build_test_deploy
Process completed with exit code 1.
Ubuntu (22.04, clang 15.0.7, open-mpi 4.1.2) / build_test_deploy
Process completed with exit code 1.
code_coverage / build_test_deploy
Process completed with exit code 1.
Ubuntu (20.04, gcc 10.5.0, open-mpi 4.0.3) - github codespaces / build_test_deploy
Process completed with exit code 1.
Ubuntu (22.04, gcc 11.4.0, open-mpi 4.1.2) / build_test_deploy
Process completed with exit code 1.
Ubuntu (20.04, gcc 9.4.0, open-mpi 4.0.3) / build_test_deploy
Process completed with exit code 1.
Pangea 2 (centos 7.6, gcc 8.3.0, open-mpi 2.1.5, mkl 2019.3) / build_test_deploy
Canceling since a higher priority waiting request for 'GEOS CI-refs/pull/3209/merge' exists
Pecan CPU (centos 7.7, gcc 8.2.0, open-mpi 4.0.1, mkl 2019.5) / build_test_deploy
Canceling since a higher priority waiting request for 'GEOS CI-refs/pull/3209/merge' exists
Sherlock CPU (centos 7.9.2009, gcc 10.1.0, open-mpi 4.1.2, openblas 0.3.10) / build_test_deploy
Canceling since a higher priority waiting request for 'GEOS CI-refs/pull/3209/merge' exists
Ubuntu (22.04, gcc 12.3.0, open-mpi 4.1.2) / build_test_deploy
Canceling since a higher priority waiting request for 'GEOS CI-refs/pull/3209/merge' exists
Ubuntu (22.04, gcc 12.3.0, open-mpi 4.1.2) / build_test_deploy
The operation was canceled.
check_that_all_jobs_succeeded
Process completed with exit code 1.