Skip to content

refactor: fix creation of mass handling. #5993

refactor: fix creation of mass handling.

refactor: fix creation of mass handling. #5993

Triggered via pull request July 6, 2024 00:24
Status Cancelled
Total duration 12m 25s
Billable time 2m
Artifacts

ci_tests.yml

on: pull_request
is_not_draft_pull_request
4s
is_not_draft_pull_request
Matrix: cpu_builds
Matrix: check_code_style_and_documentation
Matrix: cuda_builds
if_not_unassigned_pull_request
2s
if_not_unassigned_pull_request
are_submodules_in_sync
10s
are_submodules_in_sync
baseline_log
4s
baseline_log
code_coverage  /  build_test_deploy
1m 54s
code_coverage / build_test_deploy
run_integrated_tests  /  build_test_deploy
run_integrated_tests / build_test_deploy
check_that_all_jobs_succeeded
0s
check_that_all_jobs_succeeded
Fit to window
Zoom out
Zoom in

Annotations

22 errors
Centos (7.7, gcc 8.3.1, open-mpi 1.10.7, cuda 11.8.89) / build_test_deploy
Process completed with exit code 1.
Check code style / build_test_deploy
Process completed with exit code 8.
Ubuntu (22.04, clang 15.0.7, open-mpi 4.1.2) / build_test_deploy
Process completed with exit code 1.
Ubuntu (22.04, gcc 12.3.0, open-mpi 4.1.2) / build_test_deploy
Process completed with exit code 1.
Ubuntu (22.04, gcc 11.4.0, open-mpi 4.1.2) / build_test_deploy
Process completed with exit code 1.
code_coverage / build_test_deploy
Process completed with exit code 1.
Ubuntu (20.04, gcc 10.5.0, open-mpi 4.0.3) - github codespaces / build_test_deploy
Canceling since a higher priority waiting request for 'GEOS CI-refs/pull/3215/merge' exists
Pangea 2 (centos 7.6, gcc 8.3.0, open-mpi 2.1.5, mkl 2019.3) / build_test_deploy
Canceling since a higher priority waiting request for 'GEOS CI-refs/pull/3215/merge' exists
Ubuntu (20.04, gcc 9.4.0, open-mpi 4.0.3) / build_test_deploy
Canceling since a higher priority waiting request for 'GEOS CI-refs/pull/3215/merge' exists
Ubuntu (20.04, gcc 9.4.0, open-mpi 4.0.3) / build_test_deploy
The operation was canceled.
Pecan CPU (centos 7.7, gcc 8.2.0, open-mpi 4.0.1, mkl 2019.5) / build_test_deploy
Canceling since a higher priority waiting request for 'GEOS CI-refs/pull/3215/merge' exists
Sherlock CPU (centos 7.9.2009, gcc 10.1.0, open-mpi 4.1.2, openblas 0.3.10) / build_test_deploy
Canceling since a higher priority waiting request for 'GEOS CI-refs/pull/3215/merge' exists
check_that_all_jobs_succeeded
Process completed with exit code 1.