chore(deps): update dependency ws to v8 [security] #7296
build-and-test-pr.yml
on: pull_request
Turbo Affected
/
Determine Affected
31s
Matrix: Test Mobile E2E / Ledger Live Mobile - Android Detox Tests
Matrix: Build Desktop / build-desktop-app
Build Mobile
/
Build LLM | Android
7m 8s
Build Mobile
/
Build LLM | iOS
5m 17s
Test Mobile
/
LLM CodeCheck
5m 54s
Test Design System
/
Design System Tests
1m 5s
Test Desktop
/
LLD Code Checks
7m 15s
Test Desktop
/
Desktop Unit Tests
4m 15s
Test Libraries
/
Test Libraries
2m 15s
Test Libraries
/
Codecheck Libraries
4m 19s
Test Libraries
/
Test Docs
1m 56s
Test Mobile E2E
/
Allure Reports Export on Server
0s
Matrix: Test Mobile E2E / Upload to Xray
Test Mobile E2E
/
Allure Reports Export on Server
0s
OK
0s
Annotations
14 errors and 1 warning
Test Libraries / Test Libraries
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
Test Libraries / Test Libraries
The operation was canceled.
|
Build Desktop / Build LLD | win
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7595/merge' exists
|
Build Desktop / Build LLD | win
The operation was canceled.
|
Test Desktop / LLD Code Checks
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7595/merge' exists
|
Test Desktop / LLD Code Checks
The operation was canceled.
|
Test Mobile E2E / Ledger Live Mobile - Android Detox Tests (1, 1)
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7595/merge' exists
|
Test Mobile E2E / Ledger Live Mobile - Android Detox Tests (1, 1)
The operation was canceled.
|
Build Mobile / Build LLM | Android
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7595/merge' exists
|
Build Mobile / Build LLM | Android
The operation was canceled.
|
Test Desktop / Desktop Tests E2E (Ubuntu)
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7595/merge' exists
|
Test Desktop / Desktop Tests E2E (Ubuntu)
The operation was canceled.
|
Test Mobile E2E / LLM - iOS Detox Tests
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7595/merge' exists
|
Test Mobile E2E / LLM - iOS Detox Tests
The operation was canceled.
|
Test Mobile / LLM CodeCheck
No files were found with the provided path: /home/runner/work/ledger-live/ledger-live/apps/ledger-live-mobile/lint-mobile.json. No artifacts will be uploaded.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
2.97.1-sha.a13fc9fce6c9bc447d4b5143a854222ba5380d5f-linux-x86_64.AppImage
|
183 MB |
|
2.97.1-sha.a13fc9fce6c9bc447d4b5143a854222ba5380d5f-mac.dmg
|
247 MB |
|
ios-test-artifacts
|
4.83 KB |
|
linux-js-bundle-metafiles
|
663 KB |
|
mac-js-bundle-metafiles
|
664 KB |
|
mobile.metafile.json
|
213 Bytes |
|
outputs-codecheck
|
298 Bytes |
|
outputs-test-ui
|
165 Bytes |
|