Skip to content

✨ 添加新的图标配置,更新链接以指向新的资源 #4

✨ 添加新的图标配置,更新链接以指向新的资源

✨ 添加新的图标配置,更新链接以指向新的资源 #4

Triggered via push January 12, 2025 16:49
Status Failure
Total duration 1m 2s
Artifacts

pre-commit.yml

on: push
Matrix: pre-commit
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 1 warning
pre-commit (3.11)
Process completed with exit code 1.
pre-commit (3.10)
The job was canceled because "_3_11" failed.
pre-commit (3.10)
The operation was canceled.
pre-commit (3.12)
The job was canceled because "_3_11" failed.
pre-commit (3.12)
The operation was canceled.
pre-commit (3.13)
The job was canceled because "_3_11" failed.
pre-commit (3.13)
The operation was canceled.
pre-commit (3.11)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636