Skip to content

Commit

Permalink
Add cost functions example interpretation column
Browse files Browse the repository at this point in the history
  • Loading branch information
GabrielKS committed Jun 10, 2024
1 parent 2c93ede commit 6c32a9d
Showing 1 changed file with 9 additions and 9 deletions.
18 changes: 9 additions & 9 deletions docs/src/modeler_guide/cost_functions.md
Original file line number Diff line number Diff line change
Expand Up @@ -5,13 +5,13 @@ PowerSystems.jl provides an extensive type hierarchy to explicitly express relat
To represent a cost for a particular [`Component`](@ref), the modeler first chooses one of the variable cost representations in the table below. Then, they wrap this [`ProductionVariableCostCurve`](@ref) in either a [`CostCurve`](@ref) to indicate a cost in currency or in a [`FuelCurve`](@ref) to indicate a cost per unit of fuel plus a fuel cost. Finally, the user creates a domain-specific [`OperationalCost`](@ref) that contains this variable cost as well as other costs that may exist in that domain, such as a fixed cost that is always incurred when the unit is on. For instance, we may have `RenewableGenerationCost(CostCurve(LinearCurve(22.0)))` to represent the cost of a renewable unit that produces at \$22/MWh, or `ThermalGenerationCost(; variable = CostCurve(LinearCurve(22.0)), fixed = 1.0, start_up = 2.0, shut_down = 3.0)` to represent the cost of a thermal unit that produces at \$22/MWh plus a fixed cost of \$1.0/hr, a start-up cost of \$2.0, and a shut-down cost of \$3.0. Below, we give the options for `ProductionVariableCostCurve`s. Information on what domain-specific cost must be provided for a given component type can be found in that component type's documentation.

## Variable Cost Representations
For more details, see the documentation page for each type.
For more details, see the documentation page for each type. "Example interpretation" assumes the cost is wrapped in a `CostCurve` with natural units. Note that all three `Piecewise` options here fundamentally represent the same curve.

| Type alias | Description | Constructor parameters | Example |
| :--- | :--- | :--- | :--- |
| `LinearCurve` | Linear input-output curve with zero no-load cost (constant average rate) | Average/marginal rate | `LinearCurve(3.0)` |
| `LinearCurve` | Linear input-output curve with nonzero no-load cost (constant marginal rate) | Marginal rate, cost at zero production | `LinearCurve(3.0, 5.0)` |
| `QuadraticCurve` | Quadratic input-output curve, may have nonzero no-load cost | Quadratic, proportional, and constant terms of input-output curve | `QuadraticCurve(1.0, 1.0, 18.0)` |
| `PiecewisePointCurve` | Piecewise linear curve specified by cost values at production points | Vector of (production, cost) pairs | `PiecewisePointCurve([(1.0, 20.0), (2.0, 24.0), (3.0, 30.0)])` |
| `PiecewiseIncrementalCurve` | Piecewise linear curve specified by marginal rates (slopes) between production points, may have nonzero initial value | Cost at minimum production point, vector of $n$ production points, vector of $n-1$ marginal rates/slopes of the curve segments between the points | `PiecewiseIncrementalCurve(20., [1.0, 2.0, 3.0], [4.0, 6.0])` |
| `PiecewiseAverageCurve` | Piecewise linear curve specified by average rates between production points, may have nonzero initial value | Cost at minimum production point, vector of $n$ production points, vector of average rates at the $n-1$ latter points | `PiecewiseAverageCurve(20., [1.0, 2.0, 3.0], [12.0, 10.0])` |
| Type alias | Description | Constructor parameters | Example | Example interpretation |
| :--- | :--- | :--- | :--- | :--- |
| `LinearCurve` | Linear input-output curve with zero no-load cost (constant average rate) | Average/marginal rate | `LinearCurve(3.0)` | \$3/MWh |
| `LinearCurve` | Linear input-output curve with nonzero no-load cost (constant marginal rate) | Marginal rate, cost at zero production | `LinearCurve(3.0, 5.0)` | \$3/MWh + \$5/hr
| `QuadraticCurve` | Quadratic input-output curve, may have nonzero no-load cost | Quadratic, proportional, and constant terms of input-output curve | `QuadraticCurve(1.0, 1.0, 18.0)` | $C(P) = 1 P^2 + 1 P + 18$ where $C$ is \$/hr, $P$ is MW
| `PiecewisePointCurve` | Piecewise linear curve specified by cost values at production points | Vector of (production, cost) pairs | `PiecewisePointCurve([(1.0, 20.0), (2.0, 24.0), (3.0, 30.0)])` | \$20/hr @ 1 MW, \$24/hr @ 2 MW, \$30/hr @ 3 MW, linear \$/hr interpolation between these points
| `PiecewiseIncrementalCurve` | Piecewise linear curve specified by marginal rates (slopes) between production points, may have nonzero initial value | Cost at minimum production point, vector of $n$ production points, vector of $n-1$ marginal rates/slopes of the curve segments between the points | `PiecewiseIncrementalCurve(20., [1.0, 2.0, 3.0], [4.0, 6.0])` | \$20/hr @ 1 MW plus additional \$4/MWh from 1 MW to 2 MW plus additional \$6/MWh from 2 MW to 3 MW
| `PiecewiseAverageCurve` | Piecewise linear curve specified by average rates between production points, may have nonzero initial value | Cost at minimum production point, vector of $n$ production points, vector of average rates at the $n-1$ latter points | `PiecewiseAverageCurve(20., [1.0, 2.0, 3.0], [12.0, 10.0])` | \$20/hr @ 1 MW, \$12/MWh @ 2 MW, \$10/MWh @ 3 MW, linear \$/hr interpolation between these points

0 comments on commit 6c32a9d