Skip collateral return if it is too small #1391
main.yml
on: pull_request
Matrix: build
Matrix: continuous-integration
Annotations
9 errors and 4 warnings
build (macos-latest, 3.11)
Process completed with exit code 2.
|
build (ubuntu-latest, 3.11)
The job was canceled because "macos-latest_3_11" failed.
|
build (ubuntu-latest, 3.11)
The operation was canceled.
|
build (macos-latest, 3.10)
The job was canceled because "macos-latest_3_11" failed.
|
build (macos-latest, 3.10)
The operation was canceled.
|
build (macos-latest, 3.9)
The job was canceled because "macos-latest_3_11" failed.
|
build (macos-latest, 3.9)
The operation was canceled.
|
build (macos-latest, 3.8)
The job was canceled because "macos-latest_3_11" failed.
|
build (macos-latest, 3.8)
The operation was canceled.
|
build (ubuntu-latest, 3.9)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
build (ubuntu-latest, 3.8)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
build (ubuntu-latest, 3.10)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
continuous-integration (ubuntu-latest, 3.11)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|