reenable gfx1100 ci #469
Triggered via pull request
February 6, 2025 17:07
Status
Failure
Total duration
6h 4m 18s
Artifacts
–
Annotations
4 errors and 1 warning
Integration-Tests-AMD (linux-mi300-gpu-1)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
Integration-Tests-AMD (linux-mi300-gpu-1)
The self-hosted runner: linux-mi300-gpu-1-9pgn9-runner-g5ss5 lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
|
Integration-Tests-AMD (gfx1100)
The job running on runner aus-navi3x-21 has exceeded the maximum execution time of 360 minutes.
|
Integration-Tests-AMD (gfx1100)
The operation was canceled.
|
Integration-Tests-AMD (linux-mi300-gpu-1)
Docker pull failed with exit code 1, back off 7.677 seconds before retry.
|