Skip to content

Merge pull request #511 from ArnoStrouwen/patch-5 #1865

Merge pull request #511 from ArnoStrouwen/patch-5

Merge pull request #511 from ArnoStrouwen/patch-5 #1865

Triggered via push September 29, 2023 08:03
Status Failure
Total duration 6h 1m 4s
Artifacts

Downstream.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
DiffEqBase.jl/Downstream2/1.6
Process completed with exit code 1.
DiffEqBase.jl/Core/1.6
Process completed with exit code 1.
SimpleDiffEq.jl/All/1
Process completed with exit code 1.
SimpleDiffEq.jl/All/1.6
Process completed with exit code 1.
DiffEqBase.jl/Downstream/1
Process completed with exit code 1.
DiffEqBase.jl/Downstream2/1
Process completed with exit code 1.
DiffEqBase.jl/Core/1
Process completed with exit code 1.
DiffEqBase.jl/Downstream/1.6
Process completed with exit code 1.
OrdinaryDiffEq.jl/Integrators/1.6
Process completed with exit code 1.
NonlinearSolve.jl/All/1.6
The job running on runner GitHub Actions 54 has exceeded the maximum execution time of 360 minutes.
NonlinearSolve.jl/All/1.6
The operation was canceled.