Iron Semi-Binary Build #24
Annotations
4 errors and 4 warnings
binary (iron, main) / iron main
Process completed with exit code 1.
|
binary (iron, main) / iron main
The process '/usr/bin/git' failed with exit code 1
|
binary (iron, testing) / iron testing
The process '/usr/bin/git' failed with exit code 1
|
binary (iron, testing) / iron testing
Process completed with exit code 1.
|
binary (iron, testing) / iron testing
Failed to download action 'https://api.github.com/repos/actions/checkout/tarball/0ad4b8fadaa221de15dcec353f45205ec38ea70b'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
binary (iron, testing) / iron testing
Back off 17.628 seconds before retry.
|
binary (iron, testing) / iron testing
Failed to download action 'https://api.github.com/repos/actions/checkout/tarball/0ad4b8fadaa221de15dcec353f45205ec38ea70b'. Error: Connection reset by peer (api.github.com:443)
|
binary (iron, testing) / iron testing
Back off 21.413 seconds before retry.
|