GL-2582: Updated schedule pipeline to run with drupal projects only. #224
ci.yml
on: push
Matrix: test
build-release
18s
check
1s
Annotations
11 errors
build-release
Process completed with exit code 1.
|
test (ubuntu-22.04, 8.2, pcov)
Process completed with exit code 1.
|
test (ubuntu-22.04, 8.1, none)
The job was canceled because "ubuntu-22_04_8_2_pcov" failed.
|
test (ubuntu-22.04, 8.1, none)
The operation was canceled.
|
test (ubuntu-22.04, 8.3, none)
The job was canceled because "ubuntu-22_04_8_2_pcov" failed.
|
test (ubuntu-22.04, 8.3, none)
The operation was canceled.
|
test (ubuntu-22.04, 8.2, none)
The job was canceled because "ubuntu-22_04_8_2_pcov" failed.
|
test (ubuntu-22.04, 8.2, none)
The operation was canceled.
|
test (windows-2022, 8.2, none)
The job was canceled because "ubuntu-22_04_8_2_pcov" failed.
|
test (windows-2022, 8.2, none)
The operation was canceled.
|
check
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
acli.phar
Expired
|
2.07 MB |
|