Skip to content

Merge pull request #11 from dlinssen/main #31

Merge pull request #11 from dlinssen/main

Merge pull request #11 from dlinssen/main #31

Triggered via push December 3, 2024 13:30
Status Failure
Total duration 26s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 1 warning
build (3.9)
Process completed with exit code 30.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
Process completed with exit code 30.
build (3.8)
The job was canceled because "_3_9" failed.
build (3.8)
The operation was canceled.
build (3.9)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636