Deploy Camel Kafka Connector Snapshot #1478
Annotations
1 error and 4 warnings
deploy (17)
Process completed with exit code 1.
|
build (17)
Failed to download action 'https://api.github.com/repos/actions/setup-java/tarball/b36c23c0d998641eff861008f374ee103c25ac73'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
build (17)
Back off 26.65 seconds before retry.
|
build (17)
Failed to download action 'https://api.github.com/repos/actions/setup-java/tarball/b36c23c0d998641eff861008f374ee103c25ac73'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
build (17)
Back off 29.51 seconds before retry.
|