Skip to content

Revamping the Ballerina MongoDB Connector #40

Revamping the Ballerina MongoDB Connector

Revamping the Ballerina MongoDB Connector #40

Triggered via pull request March 14, 2024 09:40
Status Cancelled
Total duration 2m 43s
Artifacts

pull-request.yml

on: pull_request
Run PR Build Workflow  /  Build
2m 33s
Run PR Build Workflow / Build
Fit to window
Zoom out
Zoom in

Annotations

2 errors
Run PR Build Workflow / Build
Canceling since a higher priority waiting request for 'PR Build-236' exists
Run PR Build Workflow / Build
The operation was canceled.