Skip to content

pass cancellation token future to servers #18

pass cancellation token future to servers

pass cancellation token future to servers #18

Triggered via push September 27, 2024 22:57
Status Failure
Total duration 4m 2s
Artifacts 4

ci.yaml

on: push
Matrix: compile-cln
Matrix: Integration tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Integration tests (v23.11.2)
Process completed with exit code 2.
Integration tests (v24.08)
The job was canceled because "v23_11_2" failed.
Integration tests (v24.08)
The operation was canceled.
Integration tests (v24.05)
The job was canceled because "v23_11_2" failed.
Integration tests (v24.05)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
Linux-X64-cln-v23.11.2 Expired
103 MB
Linux-X64-cln-v24.02.2 Expired
105 MB
Linux-X64-cln-v24.05 Expired
112 MB
Linux-X64-cln-v24.08 Expired
116 MB