Skip to content

Start 4.6 migration guide #2379

Start 4.6 migration guide

Start 4.6 migration guide #2379

Triggered via push January 13, 2024 21:44
Status Failure
Total duration 2m 47s
Artifacts

ci.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (HTML)
Process completed with exit code 2.
build (PDF)
The job was canceled because "HTML" failed.
build (PDF)
The operation was canceled.
build (EPUB)
The job was canceled because "HTML" failed.
build (EPUB)
The operation was canceled.