Strategic planning and profit / loss estimation for institutions by using fuzzy logic method.
Criteria: Population of the province, proximity of the center to the center, land price, land size.
- The more the population of the province the better,
- The closeness to the center of the present arsenal is the better,
- The less the price of the plot the better,
- The ideal size of the forest is worse as 2500 square meters get away from this value.
According to these criteria, the scores are between 0-10. 0 is the worst, 10 is the best score.
- A City, with a population of 30,000, the distance to the center of the park is 3km, the land price is 2,000,000 TL and 1800 square meters.
- B City, with a population of 190,000, the distance from the center of the park is 1 km, the land price is 1.000.000 TL and 3000 square meters.
- C City, with a population of 90,000, the distance to the center of the forest is 3 km, the land price is 3,000,000 TL and 2450 square meters.
Bulanık mantık metodu kullanarak kurumlar için stratejik planlama ve kâr / zarar tahmini.
Kriterler : İlin nüfusu, arsanın merkeze yakınlığı, arsa fiyatı, arsa büyüklüğü.
- İlin nüfusü ne kadar fazla ise o kadar iyi,
- ildeki arsanın merkeze yakınlığı ne kadar az ise o kadar iyi,
- arsa fiyatı ne kadar az ise o kadar iyi,
- arsanın ideal büyüklüğü 2500 metrekare bu değerden uzaklaştıkça kötü.
Bu kriterlere göre iller 0-10 arası puan almaktadır. 0 en kötü, 10 en iyi puan olarak baz alınmaktadır.
- A İli, 30.000 nüfuslu, arsanın merkeze uzaklığı 3km mesafe, arsa fiyatı 2.000.000 TL ve 1800 metrekare.
- B İli, 190.000 nüfuslu, arsanın merkeze uzaklığı 1 km mesafe, arsa fiyatı 1.000.000 TL ve 3000 metrekare.
- C İli, 90.000 nüfuslu, arsanın merkeze uzaklığı 3 km mesafe, arsa fiyatı 3.000.000 TL ve 2450 metrekare.