Skip to content

Bump actions/checkout from 3 to 4 #56

Bump actions/checkout from 3 to 4

Bump actions/checkout from 3 to 4 #56

Triggered via push October 7, 2023 15:51
Status Failure
Total duration 29s
Artifacts

check-lint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

3 errors
build (3.10)
Process completed with exit code 6.
build (3.11)
The job was canceled because "_3_10" failed.
build (3.11)
The operation was canceled.