Skip to content

Copy the ESLint configuration into the Docker image #844

Copy the ESLint configuration into the Docker image

Copy the ESLint configuration into the Docker image #844

Triggered via push November 26, 2024 11:11
Status Cancelled
Total duration 25m 44s
Artifacts 2

build.yml

on: push
Matrix: dockerize
lint-shell
9s
lint-shell
check-licenses
10s
check-licenses
Matrix: deploy
Fit to window
Zoom out
Zoom in

Annotations

2 errors
owasp
Canceling since a higher priority waiting request for 'Build-refs/heads/frontend-eslint-upgrade' exists
owasp
The operation was canceled.

Artifacts

Produced during runtime
Name Size
e2e-test-results Expired
55.5 KB
integration-test-results Expired
2.99 KB