Skip to content

Fix optimized build #22

Fix optimized build

Fix optimized build #22

Triggered via push May 8, 2024 13:48
Status Failure
Total duration 1m 15s
Artifacts 3

build.yml

on: push
Matrix: linux
Matrix: macos
Fit to window
Zoom out
Zoom in

Annotations

9 errors
linux (debian-12, debian:12)
Process completed with exit code 2.
linux (debian-11, debian:11)
The job was canceled because "debian-12_debian_12" failed.
linux (debian-11, debian:11)
The operation was canceled.
linux (ubuntu-20.04, ubuntu:20.04)
The job was canceled because "debian-12_debian_12" failed.
linux (ubuntu-20.04, ubuntu:20.04)
The operation was canceled.
linux (ubuntu-22.04, ubuntu:22.04)
The job was canceled because "debian-12_debian_12" failed.
linux (ubuntu-22.04, ubuntu:22.04)
The operation was canceled.
linux (ubuntu-24.04, ubuntu:24.04)
The job was canceled because "debian-12_debian_12" failed.
linux (ubuntu-24.04, ubuntu:24.04)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
lv2-gtk-ui-bridge-macos-12-591dac0a Expired
19.5 KB
lv2-gtk-ui-bridge-macos-13-591dac0a Expired
18 KB
lv2-gtk-ui-bridge-macos-14-591dac0a Expired
18.2 KB