Skip to content

more readable test #121

more readable test

more readable test #121

Triggered via push October 3, 2023 17:52
Status Failure
Total duration 29s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.10)
Process completed with exit code 30.
build (3.8)
The job was canceled because "_3_10" failed.
build (3.8)
Process completed with exit code 30.
build (3.9)
The job was canceled because "_3_10" failed.
build (3.9)
The operation was canceled.