Skip to content

Refactor code for readable #105

Refactor code for readable

Refactor code for readable #105

Triggered via push October 8, 2024 13:54
Status Failure
Total duration 3m 2s
Artifacts

ci.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

15 errors
build (3.9, 2023.5.0)
Process completed with exit code 2.
build (3.10, 2023.5.0)
The job was canceled because "_3_9_2023_5_0" failed.
build (3.10, 2023.5.0)
The operation was canceled.
build (3.12, 2023.5.0)
The job was canceled because "_3_9_2023_5_0" failed.
build (3.12, 2023.5.0)
The operation was canceled.
build (3.11, 2024.9.0)
The job was canceled because "_3_9_2023_5_0" failed.
build (3.11, 2024.9.0)
The operation was canceled.
build (3.10, 2024.9.0)
The job was canceled because "_3_9_2023_5_0" failed.
build (3.10, 2024.9.0)
The operation was canceled.
build (3.9, 2024.9.0)
The job was canceled because "_3_9_2023_5_0" failed.
build (3.9, 2024.9.0)
The operation was canceled.
build (3.12, 2024.9.0)
The job was canceled because "_3_9_2023_5_0" failed.
build (3.12, 2024.9.0)
The operation was canceled.
build (3.11, 2023.5.0)
The job was canceled because "_3_9_2023_5_0" failed.
build (3.11, 2023.5.0)
The operation was canceled.