Skip to content

Merge pull request #115 from ifwe/dependabot/npm_and_yarn/braces-3.0.3 #25

Merge pull request #115 from ifwe/dependabot/npm_and_yarn/braces-3.0.3

Merge pull request #115 from ifwe/dependabot/npm_and_yarn/braces-3.0.3 #25

Triggered via push January 22, 2025 15:36
Status Failure
Total duration 28s
Artifacts

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 1 warning
Test on node 12
Process completed with exit code 1.
Test on node 16
The job was canceled because "_12" failed.
Test on node 16
The operation was canceled.
Test on node 17
The job was canceled because "_12" failed.
Test on node 17
The operation was canceled.
Test on node 14
The job was canceled because "_12" failed.
Test on node 14
The operation was canceled.
Test on node 12
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636